My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />OTEMEZE <br />Appendix A: Initial Study /Notice of Preparation /Comments <br />Appendix 6: Air Quality and Greenhouse Gas Analysis,, Bonterra/Psomas, <br />October 2015 <br />Appendix C: Biological Assessment, Orange County Water District, July 2015 <br />Appendix D: Cultural Resources Report, Bonterra/Psomas, August 2015 <br />Appendix D1:Mang Ranch House and Kellogg House Historical Structure <br />Evaluations <br />Appendix E: Geological Report, Leighton Consulting, September 2015 <br />Appendix F: Mid Basin Centennial Park Injection Wells Project Travel Time <br />Analysis and Mounding, July 2015 <br />Appendix FI:Environmental Site Assessment, EEI Geotechnical Environmental <br />Solutions, May 2015 <br />Appendix G: Centennial Park Non-Priority Project Water Quality Plan, Fusc© <br />Engineering, November 2015 <br />Appendix H: Noise Analysis, Vista Engineering, October 2015 <br />Appendix 1: Traffic Report, Urban Crossroads, September 2!015 <br />Mid Basin, Centennial Park I 1 Project Final EIR ix <br />964e <br />
The URL can be used to link to this page
Your browser does not support the video tag.