My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />*N *6111111 W <br />wm�*a <br />The Proposed Project involves the construction of four underground injection <br />wells at Centennial Park and a below ground monitoring well at the Heritage <br />MUSeUrn. The water supply to the injection wells would be recycled water from <br />OCWD GWR System (GWRS) water treatment plant in Fountain Valley. An <br />underground pipeline would! be constructed that would extend from the GWR <br />System water supply pipeline along the Santa Ana River to Centennial Park <br />where it would branch off to the four injection well sites. When in operation the <br />four injection wells would be able to provide up to 12 million gallons per day <br />(MGD) of additional groundwater recharge capacity to the Orange County <br />Groundwater Basin, To monitor water quality in the area, a monitoring well has <br />been proposed at the Heritage Museum. <br />The Mid Basin Centennial Park Injection Well Project would involve six <br />construction activities. These activities include; <br />• Construction of Water Supply Pipeline <br />• Construction of Back Flush Pipeline <br />• Drilling and Construction of injection Wells at Centennial Park <br />• Construction of Shared Recreation /Communication Structures <br />• Repaving of Centennial Park Parking Lot <br />• Site Improvements and Drilling and Construction of a Monitoring Well at <br />Heritage Museum <br />Project Objectives <br />Below are the CEQA objectives for the Mid Basin Centennial Park Injection Well <br />Project. <br />Construct the Mid Basin Centennial Park Injection Well Project in location <br />that can readily tie into the existing GWR System pipeline with minimal <br />impacts to the environment. <br />• Provide 12 MGD per day of additional groundwater recharge capacity to <br />the Orange County Groundwater Basin. <br />Maximize the use of GWR System as the local water supply to replenish <br />the Orange County Groundwater Basin. <br />Mid Basin Centennial Park In' i Weal's Project Final EIR ES-1 <br />Y96 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.