My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2 <br />2.3 CEQA Objectives <br />Section 15124 of the CEQA Guidelines requires the Lead Agency to identify <br />project objectives to help identify a reasonable range of alternatives to the project <br />to evaluate in an EIR and to aid decision makers in preparing findings or a <br />statement of overriding considerations iif necessary. Below are the CEQA <br />objectives for the Mid Basin Centennial Park Injection Well Project. <br />• Construct the Mid Basin Centennial Park Injection Well Project in location <br />that can readily tie into the existing GWR System pipeline with minimal <br />adverse impacts to the environment. <br />• Provide 12 MGD of additional groundwater recharge capacity to the <br />Orange County Groundwater Basin, <br />• Maximize the use of GWR System as the local Water Supply to replenish <br />the Orange County Groundwater Basin. <br />• Ensure that the operation of the Mid Basin Centennial Park Injection Well <br />Project does not result in permanent loss of usable open space. <br />• Ensure that during construction and operation of the Mid Basin Centennial <br />Park Injection Well Project potential safety conflicts with students from <br />Godriez, High School, Mitchell Child Development Center and from <br />Centennial Education and Day Care Center are avoided. <br />• Ensure that the construction and operation of the Mid Basin Centennial <br />Park Injection Well Project is compatible with park facilities. <br />Mid Basin Centennial Park 1 "'16' <br />Z 5 -96 Project Final EIR 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.