My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Repaving of Centennial Park Parking Lot <br />Once the construction activities are completed, the parking areas and roadways <br />at Centennial Park would be repaved. As shown in Figure 5 a total of 9.64 acres <br />of area would be repaved. The paving activity would include the grinding and <br />removal of two inches of existing asphalt, replacing the depth with new asphalt, <br />and restoring the parking and roadway painting and markings. The repaving of <br />the parking lot would not result in the loss of any existing parking spaces. Prior <br />to the start of paving OCWD would coordinate with Santa Ana College <br />Centennial Education Center on the appropriate time of the year to repave the <br />parking lot. <br />Construction of Monitoring Well <br />A bellow ground monitoring well would be constructed within an existing dirt <br />parking area at the Heritage Museum site. The monitoring well would be housed <br />in an underground vault with a 2' x 3' metal cover and 6'x 7' concrete apron. The <br />concrete apron WOUd be incorporated into the existing parking area. The <br />monitoring well! would operate 24 hours per day monitoring water levels and <br />water quality. However, unlike injection wells the monitoring well would sit idle, <br />until the time it is sampled or maintained. As shown in Figure 6 a 5,000 square <br />foot area would be needed to construct, operate and maintain the monitoring <br />well). The proposed well would be a nested monitoring well and Would be drilled <br />by direct mud rotary drilling equipment and would occur 24 hours a day over a <br />two week period and 12 hours day over another two week period. After the well <br />construction is completed the existing dirt parking lot would be resurfaced with <br />decomposed granite. Additionally, as part of site improvements at Heritage <br />Museum, an existing irrigation system to the demonstrate garden would be <br />replaced and interpretive education kiosks would be installed. <br />The long term operation of the monitoring well would include water level <br />monitoring and water quality sampling. The monitoring activities would occur <br />during the day generally on a monthly to quarterly basis. <br />3,.4 Long Term Maintenance <br />Injection Wells <br />The injection wells are routinely redeveloped every two to five years to remove <br />accumulated sediments and microbiological build-up within the well casings to <br />restore the well capacity to operate at their maximum injection capacity. As part <br />of the redevelopment the injection well would be back washed. The discharging <br />of the well water associated with redevelopment activities would be conducted in <br />accordance with NPDES Permit requirements. Typical injection well <br />redevelopment activities would involve field equipment such as outrigger crane, <br />Mid Basin Centennial Park I 1 Project Final EIR 3-9 <br />9U -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.