Laserfiche WebLink
Section 3 <br />air compressor, flatbed truck and crew of up to four employees, The <br />redevelopment of an injection, well Could take up to two weeks and would occur <br />during the day, <br />Monitoring Wells <br />Every two to five years OCWD assesses the condition of monitoring wells to <br />determine if they need redevelopment. The redevelopment activities would be <br />similar to an injection well- <br />3.5 Project Design Features <br />The following design features have been incorporated into the Mid Basin <br />Centennial Park Injections Well Project. <br />Noise Reduction <br />• To minimize noise impacts to the environment sound walls would be <br />proved around each well site. <br />a) MBI-2 will have a 24-foot high temporary sound barrier on the <br />northeast, southeast, and southwest sides of MBI-2 construction <br />area. <br />b) MBI-3 will have a 24-foot high temporary sound barrier on the <br />north, east and west sides of MBI-3 construction area, <br />c) MBI-4 will have a 24-foot high temporary sound barrier around the <br />perimeter of MBI-4 construction area. <br />d) MBI-5 will have a 24-foot high temporary sound barrier around the <br />perimeter of MB 1-5 construction area. <br />e) The Monitoring Well will have a 24-foot high temporary sound <br />barrier around the perimeter of the Monitoring Well construction <br />area and will also have an 8-foot high sound blanket located on the <br />north and east sides of the air compressor. <br />• To minimize potential noise during the day when school would in session <br />at Godinez High School, Mitchell Developmental School and Centennial <br />Education Center, the construction of the water supply pipeline and back <br />wash pipeline Would occur at night. <br />• The Heritage Museum, site improvements would occur when school is not <br />in session at Mitchell Development School and Godinez High School, <br />• The construction of the monitoring well sound wall at the Heritage <br />Museum would Occur when school is not in session at Mitchell <br />Development School and Godinez High School. <br />Mid Basin Centennial Park lru'patipn §d Project Final EIR 3-10 <br />