Laserfiche WebLink
Section 3 <br />The construction of the MBI-5 Well sound wall would occur when school is <br />not in session at Centennial Education Center and Godinez High School. <br />• Paving activities at Centennial Park Would be coordinated with Santa Ana <br />Unified School District and Centennial Education Center to minimize noise <br />impacts. <br />• Well redevelopment maintenance activities for MBl-2, MBI-4 and the <br />monitoring well would Occur when school is not is session. <br />Traffic CirculationlParking <br />• After well drilling, well construction and well development activities are <br />completed the size of the work area will be reduced to free up available <br />parking at Centennial Park. <br />To maintain safe circulation during the day along the Centennial Loop the <br />segment of water supply and back flush pipelines within Centennial Park <br />will constructed at night. <br />To minimize potential construction traffic congestion within Centennial <br />Park, all construction traffic entering Centennial Park would be required to <br />utilize the Edinger Avenue /Mohawk Drive Entrance, <br />r <br />'*IFF§R=FA <br />• To help to conserve domestic water with the City Santa Ana, groundwater <br />back flushed from OCWD injection would be used to maintain water level <br />1117900OMMIM. 111110.53 <br />To minimize surface water impacts a 10 foot wide by 200 foot long <br />pervious sidewalk would be constructed between Centennial Park Parking <br />Lot 5 to the proposed Shared recreation/Communication Structure 1 near <br />the soccer field complex. <br />3.6 Construction Phasing Plan <br />The Proposed Project is estimated to take 14 months of active construction over <br />a 24 to 30 month period and is broken into 8 construction phases. Construction <br />operations are expected to start in early 2017 and conclude in 2019. A summary <br />of the construction activities and the times when they would occur are shown in <br />Table 2. <br />Mid Basin Centennial Park I I Project Final EIR 3-13 <br />wm <br />