My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Table 2: Summary of Construction Activities <br />phase <br />Activity Description <br />Equipment <br />Duration, <br />(days) <br />Location <br />Phase <br />Duration <br />(days) <br />Supply Pipeline on Bridge and GWRS <br />Tie-In <br />*45 <br />Pipelines, <br />Structures, <br />Heritage <br />125 <br />SUpply Pipeline in Edinger <br />Supply & Backflush Pipelines in Park <br />20 <br />51 <br />Shared Structure ConStrUction <br />'125 <br />Heritage Site Improvements <br />*14 <br />`Shanad Structure Censiruch ©n occurs concurrent %ith Putelfirle, COPSIFOCrOq P,pulinp, orb Nndge G*RS OcCUrs concurfart with Other Nipt-finis, <br />Constfuctina. i Site riproverrepts Occurs, concurreN wilti Shared Structures <br />II <br />Sound Panel Installation and Removal <br />8 <br />MBI-5: Drill <br />28 <br />Conductor Casing Installation <br />I <br />Borehole Drillinq and Reaming <br />14 <br />Well Construction <br />5 <br />III <br />Sound Panel Installation and Removal <br />Conductor Casing Installation <br />8 <br />1 <br />MBI-3: Drill <br />28 <br />Borehole Drilling and Reaming <br />14 <br />Well Construction <br />5 <br />Well Development <br />*14 <br />MBI-5: Develop <br />• Well Develo pment occurs concurrent with Borehole Drilling and Reamin <br />g <br />IV <br />Sound Panel Installation and Removal <br />Conductor Casin Installs @ion <br />8 <br />1 <br />MBI-2: Drill <br />28 <br />Borehole Drilling and Reaming <br />14 <br />Well Construction <br />5 <br />Well Development <br />*14 <br />MBI-37 Develop <br />• Well Develo pment occurs concurrent with Borehole Drilling and Reamin g <br />V <br />Sound Panel Installation and Removal <br />a <br />MBI-4: Drill <br />28 <br />Conductor Casing Installation <br />1 <br />Borehole Drilling and Reaming <br />14 <br />Well Construction <br />5 <br />Well Development <br />14 <br />flop <br />Well Dsvela ment occurs concurrent with Borehole Drilling and Reaming <br />VI <br />Well Development <br />14 <br />MBI-4, Develo <br />14 <br />VII <br />Sound Panel Installation, and Removal <br />Conductor Casinginstallation <br />B <br />Monitoring Well <br />36 <br />Mid Basin Centennial Park I ' t' §qll Project Final EIR 3-14 <br />sc. A e— 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.