Laserfiche WebLink
I Perform tests on various construction materials as required by the City. <br />4. Inspectors who perform work in confined areas or at elevated levels shall be certified or trained for <br />confined space and fall protection. <br />5. Recommend testing method on defective work and advise the City of acceptance standards. <br />6. Provide source inspection for concrete and asphalt concrete at mixing plants, and inspection for <br />other materials at their source as required by the project specifications. <br />7. Provide other quality control services as requested by the City. <br />8. Field reports shall be submitted daily to the City. Submit and distribute typed inspection and material <br />testing reports to the City's Public Works Agency and the Planning and Building Agency in accordance <br />with "Green Book" and "CBC" requirements and to other concerned parties within a week after the <br />wort: is performed. <br />9. Submit a final report to the City within five working days upon completion of each project. <br />MATERIAL TESTING <br />• Testing lab shall have the ability to perform a wide variety of construction material testing; i.e. <br />soils, Portland cement concrete, asphalt concrete, reinforcement, structural steel, welding, paint, <br />etc. as required for road widening projects, sub -surface projects, building, bridges, etc. <br />• Comply with the City's Quality Assurance Program (QAP). The City has adopted Appendix Y <br />of the Caltrans Quality Assurance Program with related attachments. A copy can be provided <br />upon request. <br />• Engineer of record for all inspection and materials testing services required under this contract <br />shall be registered as a professional engineer in the State of California. <br />• Possession of applicable certifications for all personnel and laboratories. Certifications shall be <br />valid, up-to-date, and a copy of each provided to the City at the award of the contract. <br />• Understanding of and extensive experience with Federal (FEMA), National and/or applicable <br />International (AASHTO and/or ASTM), State (Caltrans) and Local guidelines, procedures, and <br />certifications for laboratory and personnel assigned to projects. <br />• Laboratory facilities and staff shall have and maintain current Caltrans accreditation throughout <br />duration of contact. Verification of required qualifications for these accreditations is required to <br />be submitted with the proposal. <br />• All labs providing testing to primary consultant shall have the same licensing, accreditation, and <br />certification requirement as primary consultant. <br />ADDITIONAL REQUIREMENTS <br />Some of the city projects are funded by Federal or State grants, the selected consulting firm must <br />comply with all requirements of Caltrans Construction Manual including the following: <br />City of Santa Ana RFP 15-055 <br />Page Al -2 <br />