My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NINYO & MOORE - 2016
Clerk
>
Contracts / Agreements
>
N
>
NINYO & MOORE - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:53:23 PM
Creation date
7/22/2016 8:48:31 AM
Metadata
Fields
Template:
Contracts
Company Name
NINYO & MOORE
Contract #
A-2016-113
Agency
PUBLIC WORKS
Council Approval Date
5/3/2016
Expiration Date
5/3/2018
Insurance Exp Date
5/1/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certification of Personnel <br />I. The personnel who will conduct the material sampling and testing must be certified. They must <br />he certified by Caltrans' District Materials Engineer, and, optionally, the National Institute <br />Certification of Engineering Technologies, or other authority acceptable by the Construction <br />Engineer of the City to be proficient in accepting sampling and testing. <br />2. A copy of each person's certificate must be on file in the office of the Principal Civil Engineer. <br />The certificate shall list the type of work which the individual is authorized to perform. <br />3. The testing laboratory must be under the supervision of a registered engineer with experience in <br />inspection and testing of construction materials. This engineer shall certify the results of all tests <br />performed by the lab personnel under his/her supervision. <br />4. The selected firm must maintain the laboratory testing equipment in accordance with recognized <br />national standards. <br />5. The selected firm must have an independent assurance testing and sampling program. This <br />program can be performed either by their own personnel not involved in the acceptance testing <br />and sampling, or by another quality assurance organization. <br />6. Correlation Testing Program: The Materials Laboratory shall be a participant in one or more of <br />the following testing programs: <br />a. AASHTO Materials Reference Laboratory (ARML) <br />b. Cement and Concrete Reference Laboratory (CCRL) <br />c. Caltrans' Reference Samples Program (RSP) <br />Acceptance of Testine and Sampling <br />The selected testing laboratory shall conduct acceptance testing of materials on the first day when <br />wort: is performed, and continues daily until the work is completed. <br />ReportinaTest Results <br />L When aggregate samples are taken at the material source results of sand equivalent, cleanness <br />value, and sieve analysis shall be submitted to the Resident Engineer within 24 homy. <br />2. When soils and aggregate samples are taken at the job site, results of these tests shall be <br />submitted to the Resident Engineer within 24 hours. <br />3. Results of compaction and density tests taken at the job site shall be submitted to the Resident <br />Engineer within 24 hours. <br />4. When asphalt concrete samples are taken at the plant results of the gradation, oil content, and S - <br />value shall be submitted to the Resident Engineer within 96 hours. <br />5. When asphalt concrete compaction tests are done at the site the results shall be made <br />immediately available to the Resident Engineer, <br />6. All other tests required by the project shall be submitted to the Resident Engineer within 24 <br />hours. <br />Independent Assurance Sampling and Testinc* <br />The selected firm shall establish and maintain an Independent Sampling and Testing (LSAT) <br />program: <br />ve•+a»mYY1:YECYHLlYn W ..-�6.H5. Yv1=49un%sID.i9.YWdEn.Ys's��. - ce5¢¢.xUvpawm s0�kf'Y.iYM'8'RE .....uu.sAe1.'Y�L_w"m�I <br />City of Santa Ana RFP 15-055 <br />Page Al -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.