My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ASPLUNDH CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 10:59:15 AM
Creation date
7/28/2016 3:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION CORP.
Contract #
15-6828
Agency
Public Works
Council Approval Date
4/19/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO, 15-6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />29 <br />Remove Video Detection System at Harbor <br />1 <br />L5 <br />$ 0 f <br />o <br />$ <br />Blvd and Warner Ave <br />30 Pothole For Utility Not Shown on plan 10 EA $ "!U 0, $ V�� U� ,ww, <br />TOTAL SANTA ANA BID $ pjlo I-G�,Ov� <br />City of Garden Grove <br />31 <br />Cabinet Upgrade <br />1 <br />EA <br />$ qf„(• <br />$ G(,�W <br />32 <br />Furnish and Install EVP Unit <br />17 <br />EA <br />33 Furnish and Install EVP Phase Selector S EA <br />34 Furnish and Install EVP Cable 2745 LF <br />$—f $ <br />35 Furnish and Install Pedestrian Push -Button 50 EA <br />11j1%f <br />Assembly <br />1 ftl <br />36 Furnish and Install Pedestrian Countdown 10 EA <br />$ $ <br />Module <br />Famish and install Video Detecticn Syst.m� 6 EA <br />37 <br />$ `p�' { C� $ <br />u <br />TOTAL GARDEN GROVE BID <br />S <br />City of Costa Mesa <br />Remove and salvage existing traffic signal <br />38 1 EA <br />$ $ �/ _ <br />1/a <br />cabinet. Remove foundation complete. <br />e�tl�.`r� <br />a?, <br />38 <br />Remove and salvage existing traffic signal <br />5 <br />EA <br />$j�T <br />cabinet <br />4Q <br />Remove and salvage existing UPS cabinet <br />4 <br />EA <br />$ �,. <br />$ <br />and assembly <br />41 <br />Furnish and install Type P cabinet on new <br />foundation <br />1 <br />EA <br />$ <br />$ '. 90. <br />Oral <br />42 <br />Furnish and install Type Pcabinet on <br />5 <br />EA <br />It <br />9 r7 ;ra <br />__existingfoundation <br />f <br />BP -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.