My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ASPLUNDH CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 10:59:15 AM
Creation date
7/28/2016 3:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION CORP.
Contract #
15-6828
Agency
Public Works
Council Approval Date
4/19/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B P-4 <br />CITY OF <br />SANTA ANA <br />PROPOSAL <br />PROJECT <br />NO. IS -6828 <br />Harbor Boulevard Corridor <br />Traffic Signal <br />Improvements <br />(as part of Harbor Blvd Traffic <br />Signal Synchronization <br />Project) <br />Item <br />Description <br />Qty <br />Unit <br />unit Price <br />Amount <br />43 <br />Furnish and install UPS Cabinet and UPS <br />4 <br />EA <br />assembly <br />44 <br />Relocate existing traffic signal controller <br />6 <br />EA <br />assembly to new controller ca binat <br />45 <br />Furnish and Install new CCTV camera <br />10 <br />EA <br />01� <br />system <br />46 <br />Remove and salvage existing CCTV camera <br />I <br />EA <br />L'o, <br />47 <br />Furnish and Install new pedestrian push <br />76 <br />EA <br />button assembly <br />48 <br />Furnish and install new pedestrian <br />58 <br />EA <br />countdown module <br />49 <br />Remove existing pull box and Furnish and <br />I <br />EA <br />10Oa <br />$ <br />Install 46E Pull Box <br />so <br />Remove existing pull box and Furnish and <br />2 <br />EA <br />00 <br />$ pa <br />$ <br />Install 95 Pull Box <br />51 <br />Furnish and Install #6E Poll -Box <br />5 <br />EA <br />$ <br />$ IV <br />52 <br />Furnish and Install HIS Pull -Box <br />3 <br />EA <br />53 <br />Furnish and Install new 3" Conduit <br />I 1175 <br />LF <br />^' <br />.... ... ... <br />I 3A <br />54 <br />Remove existing SIC Cable <br />5090 <br />LF <br />$ <br />55 <br />Furnish and install 12 Strand SMFO Cable <br />78S <br />LF <br />'10 <br />9" <br />56 <br />Furnish and Install 24 Strand SMFO Cable <br />4110 <br />LF <br />$ <br />57 <br />Furnish and Install Splice Enclosure in 46E <br />pull box. Fusion splice and terminate all <br />a <br />EA <br />$ <br />fibers per fiber schematic. <br />1.. ... ... ... .... .. . <br />58 <br />Fusion splice and terminate new fibers in <br />2 <br />EA <br />11 so <br />existing splice canister per fiber schematic <br />59 <br />Terminate fiber drop cable in fiber patch <br />3 <br />EA <br />panel <br />60 <br />Terminate fiber distribution cable in fiber <br />I <br />EA <br />patch panel <br />B P-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.