Laserfiche WebLink
Replace with: <br />This work shall include constructing AWWA C900, Class 235 DR18, PVC Water Main, and <br />appurtenances complete and in place, of the size and class, and to the alignment and grade <br />indicated on the plans. Fittings shall be gray or ductile iron conforming to AWWA Standards <br />as noted on the plans unless noted otherwise. <br />3. QUESTION: <br />Specifications page mentions all fittings to be Push On Joint and Flanged, but Plans call out <br />all fittings to be Mechanicals Joint and Flanged. <br />Response: <br />All Fittings shall be installed as noted on the construction plans. <br />4. QUESTION: <br />In Special Provision Section 7.03 page 32, 5'h paragraph, last sentence, it is stated <br />"Contractor shall supply new sewer manhole frame and covers, sewer cleanout frame and <br />covers, concrete rings and water valve pot frame, canister and lids per City standard plans." <br />Is this meant to mean we need to replace all these items on the project? Or is this meant to <br />mean to replace them as they are either damaged by our work or found to be damaged? <br />Response: <br />All utility covers, frames, concrete rings, canister and lids impacted by contractor activities <br />shall be replaced and adjusted to grade. <br />FOR THE CITY QF -SANTA ANA <br />n, v - <br />�(/� Edwin "William" <br />City Engineer <br />2of2 <br />SANTA ANA CITY COUNCIL <br />apO A. Pd,do Wncem F.9arnwnlu mldlde Ma,mrez A, pk. Am w,. P DmW ftnaed. %..n R"'. fief in�araro <br />Maya, hinyo, F". I t, Ward i Wa,d2 Wad 3 Wa,d4 Wz,d6 Wa,d6 <br />NEPI6o.299Wa$e _4IN 43rl E @alwpgidoni '10q, ,at') dn,a dn'_Wy O nru-'LigWW_at.A9 s ,a, <br />_ Y ,�.dEL�r9.4U SJLWAYro/iry_q L&:.aJi g ory <br />