My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BIG BEN, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BIG BEN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:15:50 PM
Creation date
7/28/2016 3:31:07 PM
Metadata
Fields
Template:
Contracts
Company Name
BIG BEN, INC.
Contract #
09-3213
Agency
Public Works
Council Approval Date
5/3/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulidu <br />MAYOR PRO TEM <br />Vincent F. Sarmiento <br />COUNCiLMEMBERS <br />Angelica Anemia <br />P. David Benavides <br />Michele Martinez <br />Roman Reyna <br />Sal Tinajem <br />February 19, 2016 <br />FiTURANUUMIM <br />CITY OF SANTA ANA <br />20 Civic Center Plaza + P.O. Box 1988, M-43 <br />Santa Aria, California 92702 <br />(714)047-5019 <br />wwwsanta-ana.nra <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT: PROJECT NO. 09-3213: CENTENNIAL PARK NEIGHBORHOOD WATER <br />MAIN IMPROVEMENTS <br />The following changes/clarifications have been made to the specifications of the subject project: <br />Bid Plans, Sheet 26 of 26, Detail 3 Typical Trench: <br />Does the entire trench need to be backfill with Imported Sand? <br />Yes, the entire trench needs to be backfill with Imported Sand (SE 30), except for the 4" <br />section of Crushed Miscellaneous Base (CMB). Both sections will need to be compacted to <br />a relative compaction of 90%. <br />These items will be paid under water main construction and no additional compensation will <br />be allowed. <br />Use of Mechanical Joint fittings has been the specified fitting end configuration (in lieu of <br />Push On Joints), per the construction bid plans. Some details reference use of Retainer <br />Rings only for the Mechanical Joint Fittings (Unrestrained) for abandonments, with use of <br />concrete thrust restraints. <br />For mainline fittings, valves and hydrant laterals etc: Does district want to use mechanical <br />joint with standard mechanical joint gland pack (unrestrained) or will the district require a <br />restrained fitting with the use of a Mega lug/Stargrip/Romagrip restraint? <br />1 of 2 <br />SANT A ANA CITY COUNCIL <br />Nmjmtl A Pveda VmcaniF Samnenla Mwneh: WIWI'., N"'h';a Amvxcun P namd eew»d¢s Roman Royna Sul Ln,ryem <br />M.Yor Ai§yup Pm 1'em. Wvrl i Word 2 W, d 5 Wa A It 'Nnrd 5 YVa d r, <br />nq _Ir,,33:nyl�u=,y rmr, wq U�eryr��n tey �1N: '?9:9 "Yl P6!i i'9i-,��"�L.9f9 SU 199i2�9�11:3fd9w <br />
The URL can be used to link to this page
Your browser does not support the video tag.