Laserfiche WebLink
August 9, 2013 <br />ADDENDUM No. ONE <br />PROJECT No. 10-7557 <br />Page 3 <br />and installation of all necessary electrical conduit and wiring for electrical system in <br />accordance with the plans, details and specifications. <br />9. Appendix A, Definition of Bid Items, Page 5: Bid Item No. 19 — Planting: amend the <br />paragraph to read as follows: <br />"......... and perform 60 -calendar day maintenance in accordance with the plans, details, <br />specifications and City of Santa Ana Standards." <br />10. Appendix A, Definition of Bid Items, Page 5: Bid Item No. 20 — Irrigation: amend the <br />paragraph to read as follows: <br />".........and perform 60 -calendar day maintenance in accordance with the plans, details, <br />specifications and City of Santa Ana Standards." <br />11. Appendix A, Definition of Bid Items, Page 6, Additive Alternate Bid Item No. 4 — Picnic <br />Shelter: add the following sentences to the section: <br />"This item does shall include electrical service and lighting fixtures for picnic shelter." <br />12. Appendix A, Definition of Bid Items, Page 6, Additive Alternate Bid Item No. 5 — County <br />Improvements: revise section to read as follows: <br />"Payment for "Additive Alternate 5" will be made on a lump sum (LS.) basis, as <br />specified in the Bidder's Proposal, but shall be based on related bid unit prices and shall <br />include all costs for furnishing all labor, profit, taxes, materials, tools, equipment, and <br />incidentals required, County Permit costs, remobilization as occurs, and performing all <br />work involved and required to furnish and install, irrigation, planting and rock cobble <br />improvements that occur outside the city property and within County property in <br />accordance with the plans, details and specifications." <br />All other terms and conditions remain the same. <br />FOR THE CITY AN ANA <br />William E, Galvez <br />City Engineer <br />Public Works Agency <br />