Laserfiche WebLink
PAGE 2 <br />ADDENDUM NO. ONE <br />PROJECT NO. 16-6868: WIC PAVEMENT IMPROVEMENTS <br />determination of the lowest responsive, responsible bidder and (b) the <br />issuance and sale of limited obligation improvements bonds (the "Bonds") for <br />the assessment district to be secured by such assessments. The issuance <br />and sale of such Bonds is anticipated to occur in June 2016. <br />• How will construction be phased? <br />Access to each business must be maintained at all times; therefore, <br />construction may occur during nights and weekends as directed by the <br />Engineer. Excavation of existing pavement and base paving shall be <br />completed within 24 hours; therefore, construction may be phased in block <br />segments as directed by the Engineer. For bidding purposes, the Contractor <br />shall include the aforementioned constraints in the various bit items and no <br />additional compensation will be allowed therefore. <br />• What are the conditions of the project labor agreement between unionized <br />and non -unionized workers? <br />The City of Santa Ana does not have any union requirements. <br />2. See attached pre-bid conference sign -in sheet. <br />All other terms and conditions remain the same. <br />FOR THE CITY 0,F -SANTA ANA <br />Edwin "William" Galvez, P.E. <br />City Engineer <br />SANTAANA CITY COUNCIL <br />Miguel A, Pulidoj Vincent F. Sann lento i Michele Martinez Angelica Amezcua P. David Banavitles Roman Reyna Sal Tinajero <br />Mayor ; Mayor Pro Tem, Ward 1 Ward i Ward WaM4 I Wartl5 Wartl6 <br />MPulitloCdsanta-ani V3armentm5santa-aneoro MMartnezasanta-amara AAmezcua(u)santa-anaom i DBenavidesr&,sante-anaorg RRevna0santa-ani STinaero23santa-anaoru <br />