Laserfiche WebLink
Drain inlets shall be checked and if necessary cleaned continuously to avoid flooding of areas <br />during inclement weather. <br />The Contractor shall perform pressure washing quarterly (second week of July, October, January <br />and April) to remove dirt, grime, algae, stains, gum, tar, etc. from walkways, between seats and <br />in the pedestrian tunnels of the Santa Ana Stadium to achieve a consistently clean surface, free of <br />all stains and foreign material, etc. Contractor shall also pressure wash around park restrooms. <br />The Plaza of the Flags shall have flags displayed at all times. The Contractor shall visually <br />inspect the flag every day to assure it is in good condition. Should, in the opinion of the <br />Director's Representative, the flag is not be in good condition (faded, discolored, torn and/or <br />having holes) the Contractor shall immediately request from the Director's Representative a new <br />flag. Contractor shall raise the new flag immediately upon receipt from the Director's <br />Representative. The Contractor shall replace the flags twice a year (January, July) with flags <br />provided by the City. <br />Japanese Garden Pagoda shall be cleaned daily of trash and debris <br />8.0 Irrigation System Maintenance <br />8.1 General Responsibilities <br />Contractor's Certified Irrigation Technician (CIT) shall coordinate with Calsense <br />Irrigation to establish a central computerized control irrigation management system at the <br />Contractor's office. The CIT shall have sole responsibility to program all automatic <br />irrigation systems, either from the central computerized control system or in the field, to <br />irrigate all landscape areas detailed in this Agreement. In the event the existing irrigation <br />system fails to provide full and proper coverage, the Contractor shall immediately <br />dispatch CIT'sto repair the system from the RCV to the meter and Certified Irrigation <br />Technician Assistants (CITA) to provide alternate/supplemental irrigation and/or to <br />repair heads/laterals to achieve full and proper coverage to all areas in the work site at no <br />extra cost to the City. Failure of the Contractor's CMIT to respond immediately by <br />dispatching of CIT's and/or CITA's to provide alternate/supplemental irrigation and/or <br />repair heads/laterals to stressed plant material and/or turf areas shall result in up to a $300 <br />per day penalty to the Contractor. Stressed turf or plant material is not acceptable unless <br />approved by the Director's Representative. <br />Contractor's Certified Irrigation Technicians (CIT) shall make repairs to the irrigation <br />system from RCV to the meter per the City of Santa Ana Park Services' specifications <br />and details. <br />Contractor's Certified Irrigation Technician Assistants (CITA) shall be under the <br />direction of the CMIT and CIT and shall assist the CMIT and CIT by preparing an <br />irrigation system for repair. The CITA may trench, clean, prepare the job by bringing the <br />proper tools to the site, bring pipe and fittings to the site, and otherwise assist the CMIT <br />and CIT in job preparation. To allow the CITA to gain training he/she may perform <br />repairs of the irrigation system only in the direct presence of the CMIT and/or CIT. The <br />OMIT and/or CIT must be immediately (physically) present at all times to direct/train the <br />City of Santa Ana RFP 16-063 <br />Page 23 <br />