My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WALNUT PUMP STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
09/20/2016
>
23A - PROJ - WALNUT PUMP STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2016 4:39:14 PM
Creation date
9/15/2016 4:18:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/20/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY PROSANTA L EXHIBIT 2 <br />PROJECT NO.: It -6412 <br />WALNUT PUMP STATION BUILDING UPGRADE <br />ADDENDUM TWO <br />e S ' <br />, <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />PROM: Arnaz Engineering Contractors, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sirm(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />'Unit Price <br />Amount <br />1 <br />Mobilization and Demobilization, <br />Job <br />LS <br />$ <br />$ <br />including Bonds, Permits, Cleanup <br />130 000. <br />130,000. <br />(maximum allowed is 4% of total bid <br />price)_ <br />2 <br />Survey Staking and Veritlead" of Utility <br />1 <br />LS <br />$ <br />Locations, Field Dimensions, alit Existing <br />10,000. <br />10,000. <br />131cotrlcal Work <br />3 <br />BMP implementation and Erosion <br />I <br />LS <br />$ <br />$ <br />Control/Compliance with SWPPP <br />10,000. <br />10,000. <br />Requirements <br />_ <br />4 <br />Disinfectienof Facilities Dewatered <br />1 <br />LS <br />$ <br />$ <br />During Construction <br />5,000. <br />5,000. <br />5 <br />Startap and Testing <br />I <br />LS <br />$ <br />25,000. <br />$ <br />25,000. <br />6 <br />Record Drawings, 0 &MManaals and <br />1 <br />LS <br />$ <br />$ <br />Warranties <br />5,000. <br />5,000. <br />7 <br />Training <br />1 <br />LS <br />$ <br />5,000. <br />5,000. <br />8 <br />Clearing and Go,rbbing,'4 "zee and <br />1 <br />LS <br />$ <br />$ <br />Landscape Removal, Site Demolition and <br />25,000. <br />25,000. <br />Solt Proparadon <br />9 <br />Structural,'Meohanical and Electrical <br />1 <br />LS <br />$ <br />100,000. <br />$ <br />100,000. <br />Demolition <br />10 <br />Grading and Structaml Excavation <br />1 <br />LS <br />$ <br />$ <br />35,000. <br />35,000. <br />11 <br />Retaining Walls, Walls, Fencing, Antenna <br />1 <br />LS <br />$ <br />$ <br />Foundation, Paving andF'latwork <br />300,000. <br />300,000, <br />12 <br />Connect to Existing' Piping <br />1 <br />L5 <br />$ — <br />5,000. <br />$ <br />35,000. <br />'jg'evo. <br />P -1 of P -17 <br />23A -7 <br />0 L. <br />
The URL can be used to link to this page
Your browser does not support the video tag.