CITY OF SANTA ANA
<br />PROPOSAL
<br />PROJECT NO.: 11 -6412
<br />WALNUT PUMP STATION BUILDAVG UPGRADE
<br />ADDENDUM TWO
<br />Item
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Amount
<br />13
<br />Sprinkler Irrigation Systarn
<br />I
<br />L5
<br />$
<br />28,008.
<br />28,000.
<br />14
<br />Landscaping
<br />I
<br />LS
<br />$35,000.
<br />$ 35,000.
<br />15
<br />Precast Concrete Vaults and Manholes
<br />I
<br />LS
<br />$
<br />$
<br />70,000,
<br />70,000.
<br />16
<br />Orrsite Stormwater Retention and Pollution
<br />l
<br />LS
<br />$
<br />$
<br />Prevention System
<br />35,000.
<br />35,000.
<br />17
<br />Reinforced Concrete Masonry Unit Pump
<br />I
<br />LS
<br />8
<br />620,000
<br />$
<br />820,000.
<br />Building
<br />18
<br />Reinforced Concrete Masonry Unit
<br />1
<br />LS
<br />$
<br />150,000
<br />$
<br />150,000,
<br />Storage Building
<br />19
<br />Canopy _
<br />t
<br />LS
<br />80,000,
<br />80,000.
<br />20
<br />Motorized Rolling Gate
<br />I
<br />EA
<br />$
<br />$
<br />25,000.
<br />25,000.
<br />2'1
<br />instnnnentation and Telemetry ��. _
<br />- 1
<br />LS
<br />$
<br />$
<br />85,000.
<br />$5,000.
<br />22
<br />C6° Motor - ttuatedButterflyValves
<br />6
<br />BA
<br />S
<br />15,000.
<br />$�
<br />90,000.
<br />'L3
<br />Aridge Crane, Trolley Find Hoist Systems
<br />1
<br />LS
<br />$
<br />0,000.
<br />$
<br />#0,000.
<br />24
<br />Yard Piping and Fittings
<br />1
<br />LS
<br />$240,000.
<br />$
<br />240,000,
<br />25
<br />Build Fig Plumbing Systems aril Fire
<br />1
<br />LS
<br />$10,000.
<br />$
<br />Protection Systems
<br />1 O,OgO.
<br />26
<br />Building HVAC Systems
<br />1
<br />LS
<br />$
<br />$
<br />30,000.
<br />30,000.
<br />27
<br />Yard Conduit
<br />1
<br />L5
<br />85,000.
<br />85,800.
<br />28
<br />Building and Site Eleotrical and Lighting
<br />1
<br />LS
<br />,$
<br />$
<br />System
<br />280,000.
<br />—
<br />280,000.
<br />- -$. . __
<br />29
<br />VFD Motor Control Center
<br />1
<br />LS
<br />$
<br />450,000,
<br />450,000.
<br />30
<br />Automatic Transfer Switch
<br />1
<br />LS
<br />$
<br />$
<br />20,000.
<br />20,000,
<br />31
<br />Excavation Safety Measures
<br />I
<br />LS
<br />$8 000.
<br />$ 8,000.
<br />32
<br />Sodium Rypochlorite Generation Unit
<br />I
<br />LS
<br />165,000.
<br />185,000.
<br />P -2 of P -17
<br />23A -8
<br />0y
<br />0,`'(.
<br />
|