My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SAFE ROUTE KING ELEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
10/18/2016
>
23A - PROJ - SAFE ROUTE KING ELEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 2:52:28 PM
Creation date
10/13/2016 2:48:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/18/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 18, 2016 <br />TITLE: <br />AWARD CONTRACT TO CALIFORNIA <br />PROFESSIONAL ENGINEERING, INC., FOR <br />CONSTRUCTION OF GRANT -FUNDED SAFE <br />ROUTES TO SCHOOL ENHANCEMENTS AT <br />KING ELEMENTARY (PROJECT NO. 166871) <br />(STRATEGIC PLAN NOS. 6, 1B & 1G) <br />/ / <br />CITY MANAR <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ <br />As Recommended <br />❑ <br />As Amended <br />❑ <br />Ordinance on 1't Reading <br />❑ <br />Ordinance on 2nd Reading <br />❑ <br />Implementing Resolution <br />Set Public Hearing For, <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract and authorize the City Manager and Clerk of the Council to execute a <br />construction contract to California Professional Engineering, Inc, the lowest responsible <br />bidder, in accordance with the base bid in the amount of $363,943, for the term beginning <br />upon execution of the contract and ending upon project completion, for the Safe Routes to <br />School Enhancements for King Elementary project, subject to nonsubstantive changes <br />approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$454,238, which includes the contract bid amount, administration, inspection and testing, and <br />an authorized contingency of $36,395. <br />The recommended actions are needed for the City to proceed with the installation of traffic safety <br />enhancements on City streets adjacent to King Elementary School (Exhibit 1). The improvements <br />include a new traffic signal on McFadden Avenue at Pacific Avenue, and bulb outs on Graham <br />Lane at McFadden to slow down vehicles and narrow the roadway for pedestrians crossing the <br />street. Once completed, these improvements will increase the school-age pedestrian safety <br />while promoting more walking at this location. <br />As part of this project, the existing marked school crosswalk at the un -signalized intersection of <br />McFadden Avenue and Graham Lane will be realigned one block to the west so that it coincides <br />with the new signalized intersection being installed as part of this project at McFadden Avenue <br />and Pacific Avenue. However, despite the fact the school crosswalk is being re -aligned, it could <br />be considered a crosswalk removal. Per the California Vehicle Code (CVC), crosswalk removal <br />requires that a public notice be posted at least 30 days prior to removal. Therefore, to ensure <br />that the CVC requirements are met, a public notice was posted on Thursday, October 6, <br />23A-1 <br />