My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G4S SECURE SOLUTIONS (USA) INC. 1f -2016
Clerk
>
Contracts / Agreements
>
G
>
G4S SECURE SOLUTIONS (USA) INC. 1f -2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:20:42 PM
Creation date
11/7/2016 5:01:45 PM
Metadata
Fields
Template:
Contracts
Company Name
G4S SECURE SOLUTIONS (USA) INC.
Contract #
A-2016-200
Agency
Parks, Recreation, & Community Services
Council Approval Date
8/2/2016
Expiration Date
5/31/2017
Insurance Exp Date
10/1/2017
Destruction Year
2022
Notes
A-2011-122; 01; 02; A-2014-116, A-2014-215; A-2014-254; A-2014-254-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Patrol restrooms, main floor lobby, train loading areas, balconies and upper floors of the <br />building, perimeter of entire facility, parking lots, parking structure, pedestrian bridge, east <br />and west platforms and all approaches onto the property. <br />• Maintain facility in lockdown mode when the facility is closed, unless an emergency arises <br />and respond only at the direction of SARTC management or emergency services. <br />• Ensure that unauthorized taxis, limousines, buses, etc. do not assemble on or adjacent to the <br />property. <br />• Provide vehicle and parking control throughout the facility as needed. <br />• Provide surveillance of trains, buses and passenger movement. <br />• Enforce the facility's unattended baggage policy and follow appropriate procedures. <br />• Lock down or open the facility at designated times. This will include main building, parking <br />structure and pedestrian bridge accesses. <br />• Report to SARTC management any light outages, improperly working doors and/or locks, <br />building leaks or leaks of any kind, any abnormality in function of mechanical, electrical or <br />plumbing systems, graffiti locations, suspected or observed theft or vandalism. <br />• Raise and lower flags at dawn and dusk. <br />• Check in and check out all contract personnel and provide access to service areas as <br />necessary. <br />II. RESPONSIBILITY OF CONTRACTOR <br />Provide a post management system that includes efficient mechanisms for tour verification, daily <br />activity reports (DARs), and incident reporting (IR). This system must be complete with a <br />reliable computer equipped with Internet access, Microsoft Office, a printer, downloader, and <br />any other equipment needed in leading and monitoring the security needs of the facility. <br />Provide for the SARTC CPO Post Commander (Account Manager) to travel and board in <br />Sacramento to job shadow with Jacob Culberson and the SRT security staff to cross train (16 <br />hours) on transit issues and incorporate best practices for SARTC. <br />Ensure that SARTC is secure at all times by providing security coverage as outlined in Exhibit 6. <br />Each security guard shall utilize Secure Trax devices to perform their duties. <br />Provide two Secure Trax devices for use at the SARTC. <br />Provide cellular phones and all other telecommunications or electronic equipment necessary for <br />all security officers while on duty. <br />Provide internal transportation equipment, if any, such as scooters, Segways, etc. <br />Provide a marked G4S vehicle to be parked at the SARTC. Said vehicle will be used in <br />performance of the Santa Ana Zoo patrol. <br />
The URL can be used to link to this page
Your browser does not support the video tag.