My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - BICYCLE BLVDS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
23B - PROJ - BICYCLE BLVDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:51:23 PM
Creation date
11/10/2016 3:43:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
11/15/2016
Destruction Year
2021
Document Relationships
EXCEL PAVING COMPANY
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIDE BLVDS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amonnt <br />14 <br />Adjust Survey Monument to Grade <br />EA <br />2 <br />$ <br />$ <br />7,-b17U.' <br />15 <br />Finnish and Install New Fire Hydrant <br />EA <br />4 <br />$ <br />$ <br />16 <br />Furnish and Install Water Valve Frame and <br />'EA <br />1 <br />$ <br />$ <br />Cover to Glade <br />17 <br />Abandon Water Valve <br />EA <br />2 <br />$ <br />$ <br />1 <br />31P <br />GO, <br />18 <br />Furnish and Install New Water Meter Box <br />EA <br />5 <br />$ <br />$ <br />and Cover to Grade <br />u7c) <br />19 <br />Furnish and Install 12" Gate Valve <br />EA <br />2 <br />$ <br />$ <br />l]cc <br />20 <br />Finnish and Install 8" Gate Valve <br />EA <br />1 <br />$ <br />$ <br />r <br />21 <br />Furnish and Install 6" Gate Valve <br />EA <br />1 <br />$ <br />$ <br />22 <br />Remove Fire Hydrant and Assembly <br />EA <br />4 <br />$ra <br />$ <br />23 <br />Furnish and Install Rock Swale` <br />SF <br />250 <br />$ <br />$ <br />r <br />24 <br />Landscaping <br />LS <br />1� <br />$ <br />$ <br />0 <br />r I -00- <br />C)-"25 <br />25 <br />60 Working Days landscaping <br />LS <br />I <br />$ <br />$ <br />Maintenance <br />G7 O — <br />) <br />26 <br />Furnish and Install Organic Soil" <br />CY <br />62 <br />$ <br />$ <br />212 <br />27 <br />Signing and Striping <br />LS <br />1 <br />$ <br />$ <br />0OO.- <br />OlX>b. <br />28 <br />Project Advertisement Sign <br />EA <br />2 <br />$ <br />$ <br />29 <br />Construct Concrete Collar <br />EA <br />1 <br />$ <br />$ <br />1-0.' <br />I I 10. <br />30 <br />Furnish and Install Reinforced Concrete <br />LF <br />20 <br />$ <br />$ <br />Pipe(12" Diameter) <br />( aq- <br />.3060, <br />P-2 of P -I8 <br />23B-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.