Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECTNO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIKE BLVDS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />31 <br />Construct Type `B" Catch Basin (L=7') <br />EA <br />1 <br />$ <br />$ <br />including Local Depression <br />„r <br />( 0001 <br />32 <br />Remove Interfering AC Pipe and Replace <br />LF <br />20 <br />$ <br />$ <br />with PVC Pipe complete in Place <br />PA � <br />, ?i bo <br />TOTAL BASE BID <br />$ r `� <br />ADD ALTERNATIVE ONE <br />33 <br />Unclassified Excavation* <br />CX <br />75 <br />$ <br />$ <br />34 <br />Construct PCC Sidewalk (T=4")* <br />SF <br />225 <br />$ <br />$ <br />35 <br />Construct PCC Curb Ramp* <br />SF <br />960 <br />$ <br />$ <br />`C7• � <br />tii�. <br />36 <br />Construct PCC Curb only (B -I)* <br />_ <br />.LI' <br />___ <br />265 <br />$ <br />$ <br />M010, '_ <br />37 <br />Decomposed Granite with Stabilizer* <br />SF <br />2,100 <br />$ <br />$ <br />38 <br />Furnish and install Rock Boulder <br />LS <br />1 <br />$ <br />$ <br />LO—(- LIM <br />t <br />39 <br />Landscaping <br />I'S <br />1 <br />$ <br />$ <br />40 <br />60 Working Days Landscaping <br />is <br />1 <br />$ <br />$ <br />Maintenance <br />TOTAL ADD ALTERNATIVE ONE <br />TOTAL BASE BID+ADD ALTERNATIVE. ONE <br />$ <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves <br />the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 80 working days after the commencement date stated in the Notice to <br />Proceed. Contractor shall stagger the intersection improvement work to be in multiple phases. <br />23FIP98 <br />