Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO..: 16-090 <br />WATER WELL, PUMP .AND MOTOR REPAIR SERVICES <br />Contractor and or Contractor's subcontractors must possess and maintain the following active and valid <br />licenses as applicable to individual subcontractor: <br />1, State of California Water Well Drilling Contractor's 0-57 License or Contractor's "A" License. <br />2, State of California Limited. Specialty Contractor's C-61:;. subcategory Machinery and Pump <br />Contractor's D-21 Licanse. <br />3. Have a minimum of five years of experience performing groundwater wells and pump pulling <br />services. If a Subcontractor is used, Subcontractor must also have a minimum of five years of <br />experience performing services as stated above. Also, the Contractor's project manager(s), and <br />Subcontractor's project manager(s), If any, must have a minimum of five years of experience <br />performing groundwater wells, pump pulling services, video inspections andlor motor repairs. In <br />addition, the Contractor's project manager(s) and Subcontractor's project manager(s), If any, must <br />have the following certifications: <br />4. State of California Division of Occupational Safety and Health Administration Hazardous Waste <br />Operations Emergency Response (HAZWOPER) Certffication <br />5. National Ground WoterAssoolation (NGWA) Certification—Pump Installation <br />6, Electrical Apparatus Service Association (EASA) Accredited Member Status <br />Provide all labor, equipment, materials, tools, and supervision required, to perform as -needed pump <br />pulling and machines repair services. All material, parts, and equipment shall be new,, high grade, and <br />free from defects. Such products shall conform to all Federal, State, and local regulations as they <br />relate to water wells services. <br />Obtain all necessary City County, State, and Federal permits andlor licenses for 'Contractor's <br />activities at no cost. to the ,Public Works Agency, <br />immediately notify Public Works of any, changes In, the Contractor's insurance, permits, and <br />licenses. Failure to do so may result in the immediate termination of this Contract for default. <br />Utilize protective clothing and equipment as required by Cal(OSHA andlor other regulatory agencies, <br />M, Prevailing Wage <br />The Director of the Department of Industrial Relations of the .State of California has ascertained the <br />prevailing rate of per diem wages in dollars, based on a working day of eight hours, for each craft or <br />type of worker or mechanic needed to execute any construction or maintenance contract, which may <br />be awarded by Public Works. The current prevailing wage rates as adopted by the Director of the <br />Department of Industrial Relations are incorporated herein by reference and may be accessed at <br />http:[/www.dir.ca.gov/. <br />The Contractor is required to pay the prevailing wage rate referred to above and is responsible for <br />selecting the classification of workers which will be required to perform this service in accordance <br />with the Contractor's method of performing the work. Pursuant to Section 1775 of the Labor Code <br />(State of California) Contractor shall forfeit $50 for each calendar day, or portion thereof, for each <br />worker paid less than the stipulated prevailing wage rates for any public work done under this Contract <br />or by any subcontractor. <br />25C-19 <br />