My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - WATER PUMP REHAB SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
25C - AGMT - WATER PUMP REHAB SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 4:32:37 PM
Creation date
11/10/2016 4:28:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OFSANTA ANA <br />RIP NOi : 16-096 <br />WATER WELL, PLIMP AND I40TOR. REPAIR SERVICES <br />At its sole and absolute discretion, Public Works Agency reserves the right to obtain services from other <br />sources to cornplete anyAs-Needed Repairs, <br />F. Add itlonal'Work[Location <br />All additional work provided herein shall commence on the. ,specified date established. The Contractor <br />shall proceed diligently to complete said work within the time allotted. <br />Additional work/locations may be added during the Contract period. Upon request by the Project <br />Manager, the Contractor shall provide a written quotation for any additional werMoca4on(s), based on <br />the rates quoted in Exhibit C. The Contractor shall be paid for additional work/locations in accordance <br />with the rates submitted. Upon Contract Manager's negotiation and acceptance of the Contractor's <br />written quotation the additional. work/location(s) may be added to the Contract by amendment or <br />change order. <br />G. Hours and gays of Service <br />Contractor shall respond within 24 hoars' notification to an authorized Public Works representative's <br />service request. Hours of service will be primarily Z a.m. to 5 p.m.., Monday through Friday, each <br />week. The Project Manager may alter the hours and days of services when necessary. <br />H. Utilities <br />The Public Works Agency will not provide utilities. <br />1. Storage Facilities <br />The Public Works Agency will hot provide storage facilities for the Contractor. The Public Works <br />Agancy will not to liable or responsible for any damage, by whatayer means., or for theft of materials <br />or equipment on the Jobsita. <br />J. Removalof Debris <br />All debris derived from these services shall be removed from Public Works property and become the <br />property of the Contractor. The Contractor shall dispose of all debris from these services in a legally <br />established area appropriate For type of debris being disposed. Disposal shall be at the Contractor's <br />expense. The Contractor shall not allow any debris from its operations under this Contract to be <br />deposited in the storm drains and/or gutters in violation of the National Pollutant Discharge Elimination <br />System. <br />K. Special Safety Requirements <br />All Contractor's operators shall to observe all applicable State of California Occupational Safety and <br />Health Administration (CaVOSHA) and Public Warks' safety requirements white at Public Works job sites. <br />Hard hats shall be provided by Contractor and shall be worn at all times. Suitable clothing, gloves, <br />and shoes that meet Cal/OSHA requirements are required. <br />L. Additional Responsibllitles of the Contractor <br />25C-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.