My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - WATER PUMP REHAB SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
25C - AGMT - WATER PUMP REHAB SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 4:32:37 PM
Creation date
11/10/2016 4:28:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C'ti'1OFSAATk.A.N1 <br />RFI' \0,: 10-000 <br />ATER WELL_ PL \-11) -1AD MOTOR REP UR 5I_RVI( CSS <br />terminals or lues <br />Tellus 68 oil L S 250.00 <br />Rewinding of Electric Nlotor LS ' S 760 00 <br />well work <br />Mobilization & set-up <br />450.00 <br />----- --- --.—. <br />Under Water video of well (before) <br />I <br />1,000.00 <br />Wire brushing of well section under water & <br />Ea. 1 <br />4,200.00 4,200.00 <br />_perforatioris __, <br />Chemical treatment during wire brushing (optronall 2 <br />LS i <br />_ _ <br />15,00 00 <br />Bail &dispose of all dirt &debris <br />Set I <br />- -- <br />1,500 00 <br />SONAR Jet of perforations (420 feet, three intervals) 3 <br />LS 1 <br />7,900.00 <br />Under Water video of well (after) <br />LS 1 <br />858.00 <br />LS 4W.UU <br />�lqoteAnyother work not listed above will be completod on a time and rratar'a,s oasis_ <br />Proposed new pump: Make: Peerless Model No.: 16HXB GPM: 3,000 'rDH: 165' <br />Eff.: 83.5 <br />1 Motor refurbishing includes shop work, labor and material to perfonri the following: disassembling, <br />steam cleaning, inspection, replace bearings, heaters. dipping (one thin layer, baking, reassembling, <br />testing) <br />2. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />3. Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc. (714),632-7003 <br />4. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment is applied. the bid price must include cost of the chemicals. chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />5 Pump base will be replaced, and attached to existing discharge pipe. If welding is needed. will be bill at <br />time and material. <br />6. Concrete around the pump base will have to be removed and replaced. <br />7. New Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />8. Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 23 feet when operating at full rated load. Sound proofing solution to be <br />approved by the Engineer. <br />25C-63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.