Laserfiche WebLink
PUMP REMOVAL/ INSTALLATION SERVICES (A) <br />DESCRIPTION <br />UNIT <br />NON -PREVAILING <br />RATE <br />PREVAILING <br />1A MOBILIZATION (per vehicle/crew) <br />LS <br />$ _ <br />35000 <br />$ <br />450.00 <br />2A PUMP RIG & CREW <br />HR <br />$ <br />300.00 <br />$ <br />400.00 <br />3A 12 -TON HYDROCRANE & <br />REPAIRS & INSPECTIONS <br />CREW <br />LS <br />$ <br />300,00 <br />$ <br />400.00 <br />4A DEMOBILIATION (per vehicle/crew) <br />I_S <br />$ <br />350.00 <br />$ <br />450.00 <br />WELL / PUMP REPAIR SERVICE (B) <br />DESCRIPTION <br />UNIT <br />RATE <br />18 GENERAL SHOP LABOR <br />HR <br />$ <br />55.00 <br />2B MACHINE SHOP REPAIR <br />HR <br />$ <br />100.00 <br />3B SHOP WELDING <br />HR <br />$ <br />100.00 <br />4B ON-SITE MECHANICAL <br />REPAIRS & INSPECTIONS <br />(DURING BUS. HOURS) <br />HR <br />$ <br />175.00 <br />5B ON-SITE EMERGENCY <br />MECHANICAL REPAIRS (AFTER <br />BUS. HOURS) <br />HR <br />$ <br />250.00 <br />6B WELL VIDEO SURVEY <br />EA <br />$ <br />1,200.00 <br />NON -PREVAILING <br />PREVAILING <br />76 WELL REHAB (SCRATCH & <br />BAIL) HR $ 300.00 $ 400.00 <br />ALL HOURS OVER 6HOURS @ TIME & A HALF <br />SATURDAY RATES @ TIME & A HALF <br />SUNDAY & HOLIDAY RATES @ DOUBLE TIME <br />AS NEEDED PARTS AND MATERIAL WILL BE MARKED UP 15% <br />PRICES VALID UNTIL 12/31/2014 <br />Ruben Baltierra <br />Estimator / Project Manager <br />25C-64 <br />