Laserfiche WebLink
CG4 Asset Tracking Systerl <br />City of Santa Ana <br />GoToMeeting, working with Client's Cherwell administrators, in order to reduce cost and increase scheduling <br />flexibility. <br />3. Summary of CG4 Responsibilities, Services and Deliverables <br />To achieve the stated objectives, CG4 will perform the following: <br />PHASE I (CG4 Professional Version —"Standalone Mode] <br />Provide remote Consulting Services to review Client's data, make recommendations for production operation <br />(Le, configuration parameters), and review project prerequisites and system requirements. <br />• Provide remote Professional Services to Client for the purpose of implementing Cl ATS Professional <br />version In the Client's environment. Included in these tasks Is the setup of a SQL database on Client's SQL <br />server, installation of CG4 Server software on Client's Windows server and CG4 Mobile software on Clients <br />tablet PC device. (See separate CG4 Systems Requirements document for additional details on Client <br />provided servers, Windows software, etc. that must be ready and available prior to any CG4 services being <br />performed), <br />Note: All CG4 remote services will be provided via GoToMesting by a CG4 software engineer. CG4 will <br />Instruct the Client's project leader (or designated technical resources) through all the setup and configuration <br />steps required for a successful Implementation. <br />Client will initially have asset data of manufacturer, model number and serial number/service tag <br />number, along with employee records. This data will be imported into the CG4 ATS server as the <br />Initial data set. <br />Cl will provide the formatting and instructions for Client to create the locations within Cl <br />along with any other data fields that may be required for Clients asset life cycle processes. The <br />data formatting needs to take into consideration that Cherwell will ultimately be the CMDB and <br />therefore any items created should adhere to Cherwell's future requirements to avoid any data <br />conversion In Phase 11. <br />CG4 will provide sample modules for the creation of business processes (Le. receiving, inventory, <br />check-tri/check-out, etc.) and work with Client to create/modify modules as needed. <br />• Professional Services to include knowledge transfer and Installation to achieve full loop data flow from C04 to <br />tablet PC devices. <br />Training Services for End-users via live web -based instruction by CG4 personnel, including hands-on <br />operations of the CG4-Mobile software features, functionality and operations. Training will be provided for up <br />to five (5) students. <br />+ Training materials will be provided in electronic format which Is inoluded in the software CD. An additlonal CD <br />copy is available upon request <br />• For the purposes of this SOW, a single tablet PC will be utilized. <br />• Deliver one (1) copy of latest release of CG4 ATS software, <br />PHA 7E Il (CG4 Entero' e Ver Ion—"Chervyeil Integrated Mods" <br />+ Provide the required license keys and configuration changes-to-the-CG4-software-to-accommodate-the----------- -- ----- <br />integration to Cherwell platform. <br />0 2016 CG4 aolutions, Inc. All Rights Re2erved. This document Is PROPRIETARY end CONFIDENTIAL and may not be duplicated, <br />redishlbuted, or displayed to any third party wilhomt;he expressed wrllten permission of CG4 <br />Page 2 of 4 <br />