My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:18:13 PM
Creation date
11/29/2016 11:43:29 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
15-6834
Agency
Public Works
Council Approval Date
9/20/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6834 <br />FEDERAL PROJECT NO: HSIPL 5063(156) <br />TRAFFIC SIGNAL MODIFICATIONS: 17TH STREET AT ENGLISH STREET, <br />MACARTHUR BOULEVARD AT PLAZA DRIVE, EDINGER AVENUE AT SULLIVAN <br />STREET, WESTMINSTER AVENUE AT CLINTON STREET <br />EXHIBIT 16-B Local Assistance Procedures Manual <br />Subcontracting Request <br />INSTRUCTIONS FOR COMPLETING SUBCONTRACTING <br />REQUEST FORM <br />All First-tier subcontractors must be included on a <br />subcontracting request. <br />Submit in accordance with Section 8-1.01 of the Caltrans Standard Specifications, <br />Type or print requested information. Information copy is to be retained by the <br />contractor. Submit other copies to project's Resident Engineer. After approval, the <br />original will be returned to the contractor. <br />When an entire item is subcontracted, the value to be shown is the contractor's bid <br />price. When a portion of an hem is subcontracted, describe the portion., and show <br />the % of bid item <br />and value. <br />THIS FORM IS NOT TO BE USED FOR <br />SUBSTITUTIONS. <br />Prior to submittal of Form CEM; 1201 involving a replacement Subcontractor, <br />submit a separate written request for approval to substitute a listed subcontractor. <br />Section 4107 of the Government Code covers the conditions for substitution. <br />Submit a separate written request for approval of any DBE/MBE/WBE/DVBE <br />substitution. Include appropriate backup information and state what efforts were <br />made to accomplish the same dollar value of work by other certified <br />DBE/MBL/WBC/D'VB[ s. <br />NOTE: For contractors who will be performing work on railroad property, it is necessary <br />for the contractor to complete and submit the Certificate of Insurance (State Form <br />DH -OS -A 10A) naining the subcontractor as insured. No world shall be allowed{ <br />which involves encroachment on railroad property until the specified insurance has <br />been approved. <br />Page 16-52 <br />October 5, 2012 LPP 12 <br />P-36 of P-40 <br />Back <br />
The URL can be used to link to this page
Your browser does not support the video tag.