My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - 2ND READ ORD - BUILDING CODES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
11A - 2ND READ ORD - BUILDING CODES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 5:39:01 PM
Creation date
12/1/2016 1:41:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11A
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional fire protection called for in the plan shall be provided and shall be <br />installed in accordance with this code. The increase of the pile size shall be based <br />upon the capabilities of the installed fire protection system and features. <br />(d) Section 2808.7 Pile fire protection is hereby amended by adding the following <br />statement to the last sentence: <br />2808.7 Pile fire protection. Automatic sprinkler protection shall be provided in <br />conveyor tunnels and combustible enclosures that pass under a pile. Combustible <br />conveyor systems and enclosed conveyor systems shall be equipped with an <br />approved automatic sprinkler system. Oscillating sprinklers with a sufficient <br />projectile reach are required to maintain a 40% to 60% moisture content and wet <br />down burning/smoldering areas. <br />(e) Section 2808.9 Material -handling equipment, is hereby amended by adding the <br />following sentence at the beginning of the section: <br />2808.9 Material -handling equipment. All material handling equipment operated by <br />an internal combustion engine shall be provided and maintained with an approved <br />spark arrester. Approved material -handling equipment shall be available for moving <br />wood chips, hogged material, wood fines and raw product during fire -fighting <br />operations. <br />(f) Section 2808.11 Temperature control, is hereby added as follows: <br />2808.11 Temperature control. The temperature shall be monitored and maintained <br />as specified in Sections 2808.11.1 and 2808.11.2. <br />(g) Section 2808.11.1 Pile temperature control, is hereby added as follows: <br />2808.11.1 Pile temperature control, Piles shall be rotated when the internal <br />temperature readings are in excess of 165 degrees Fahrenheit. <br />(h) Section 2808.11,2 New material temperature control, is hereby added as follows: <br />2808.11.2 New material temperature control, New loads delivered to the facility <br />shall be inspected and tested at the facility entry prior to taking delivery. Material <br />with temperature exceeding 165 degrees Fahrenheit shall not be accepted on the <br />site. New loads shall be monitored to verify that the temperature remains stable. <br />(i) Section 2808.12 Water availability is hereby added as follows: <br />2808.12 Water Availability. Facilities with over 2500 cubic feet shall provide a <br />water supply. The minimum fire flow shall be no less than 500 GPM @ 20 psi for a <br />minimum of 1 hour duration for pile heights up to 6 feet and 2 hour duration for pile <br />heights over 6 feet. If there is no water purveyor, an alternate water supply with <br />storage tank(s) shall be provided for fire suppression. The water supply tank(s) shall <br />provide a minimum capacity of 2500 gallons per pile (maximum 30,000 gallons) for <br />piles not exceeding 6 feet in height and 5000 gallons per pile (maximum 60,000) for <br />piles exceeding 6 feet in height. Water tank(s) shall not be used for any other <br />purpose unless the required fire flow is left in reserve within the tank at all times. An <br />Ordinance No. NS-XXXX <br />Page 23 of 31 <br />11 A-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.