Laserfiche WebLink
Contract Award to Install LED Lights and Light Controls <br />Agreement for On -Bill Financing Loan <br />December 6, 2016 <br />Page 2 <br />At this juncture, staff requests the City Council to approve the implementation of the Newhope <br />Library project as the second of three library retrofit projects. The first retrofit project is for the <br />Main Library which was approved by the City Council on October 4, 2016. The third retrofit <br />project is for the McFadden Learning Center which will be presented to the City Council for <br />approval in the near future. <br />The Newhope Library project consists of lighting fixtures (replace fluorescent lights with energy- <br />efficient light -emitting diode [LED] lights) and lighting controls (install occupancy sensors and <br />connect to lighting system and Building Management System). Project benefits include an <br />annual reduction of 39,403 kWh in energy usage, annual utility bill savings of $11,186 and annual <br />greenhouse gas reduction equivalent to taking 59 cars off the road as tabulated below. <br />PROJECT <br />Estimated <br />Estimated <br />Estimated <br />Annual <br />Estimated <br />Estimated <br />COMPONENTS <br />Annual kWh <br />Annual Utility Bill <br />CARS off' <br />SCE Cash <br />OBF <br />SAVINGS <br />SAVINGS <br />the Road <br />Incentives <br />Light Fixtures <br />34,079 <br />$9,786 <br />51 <br />$5,949 <br />$62,086 <br />Light Controls <br />5,324 <br />$1,400 <br />8 <br />$441 <br />$9,699 <br />Total <br />39,403 <br />$11,186 <br />59 <br />$6,390 <br />$71,785 <br />Total project cost is $78,175 including a $6,348 contingency. Payback period is 10 years. As <br />tabulated above, project cost will be fully funded by SCE using cash incentives of $6,390 and a <br />zero interest On -Bill Financing (OBF) loan of $71,785 for a total of $78,175. An innovative <br />feature of the recommended actions is the City will have no upfront costs or interest charges as <br />Pacific Lighting Management Inc. will finance the entire cost of the project. SCE will then pay <br />Pacific Lighting Management Inc. directly with the cash incentives and OBF loan proceeds that <br />SCE has approved for the project. <br />As a result of the OBF loan, the Newhope Library's new electricity bill will be different as it will <br />have a lower Amount Due based on the energy reduction from the project, and a new separate <br />line -item to show the OBF loan repayment amount. This latter amount will reflect kWh saved <br />from the project multiplied by the relevant billing rate. Once the OBF loan is paid in full, SCE will <br />discontinue the OBF loan repayment line -item, and the reduced energy usage due to the project <br />should result in smaller bills. (Cash incentives are grants and not repaid.) Staff requests Council <br />approval of the foregoing project and funding process. SCE Notices of Approval for incentives <br />and OBF loan amount (Exhibits 1 and 2) and the loan agreement form (Exhibit 3) are attached. <br />The Notice soliciting bids was advertised on September 9, 2016 on the City's online bid <br />management and publication system. A summary of the bids received is as follows: <br />36 Vendors were notified <br />2 Santa Ana vendors notified <br />27 Vendors downloaded the solicitation <br />9 Bids received <br />1 Bid received from a Santa Ana vendor <br />22Ci-2 <br />