My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - HENINGER ELEMENTARY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
23B - PROJ - HENINGER ELEMENTARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:05:08 PM
Creation date
12/1/2016 3:52:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />DECEMBER 6, 2016 <br />TITLE: <br />AWARD CONTRACT TO CALIFORNIA <br />PROFESSIONAL ENGINEERING, INC., <br />FOR GRANT -FUNDED SAFE ROUTES <br />TO SCHOOL ENHANCEMENTS AT <br />HENINGER ELEMENTARY <br />(PROJECT NO. 166870) <br />{STRATEGIC PLAN NOS. 6, 1B & 1G} <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />C] <br />As Recommended <br />L7 <br />As Amended <br />Ordinance on 1" Reading <br />El <br />Ordinance on 216 Reading <br />[] <br />Implementing Resolution <br />❑ <br />Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract and authorize the City Manager and Clerk of the Council to execute a <br />construction contract to California Professional Engineering, Inc., the lowest responsible <br />bidder, in accordance with the base bid in the amount of $417,341.50, for the term beginning <br />upon execution of the contract and ending upon project completion, for the Safe Routes to <br />School Enhancements for Heninger Elementary project, subject to nonsubstantive changes <br />approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$500,811, which includes the construction contract, administration, inspection and testing, <br />and an authorized contingency of $41,735. <br />3. Amend the Fiscal Year 2013-14 Capital Improvement Program and approve the reallocation <br />of $70,811 in Measure M2 Local Fair Share funds from the Traffic Control Devices Inventory <br />Project to the Safe Routes to School Enhancements for Heninger Elementary. <br />DISCUSSION <br />The recommended actions are needed for the City to proceed with the installation of traffic safety <br />enhancements on City streets adjacent to Heninger Elementary School (Exhibit 1). The <br />improvements include a new traffic signal at the intersection of Flower Street and Walnut Street, <br />and bulb -outs at the intersection of Walnut Street and Birch Street. The traffic signal will improve <br />safety and mobility of pedestrians in the area. The bulb -outs will slow down vehicles and narrow <br />the roadway for school children and pedestrians crossing the street. Once completed, the <br />improvements will increase safety, mobility, and ultimately promote walking in the area. <br />2313-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.