My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 12:48:47 PM
Creation date
12/13/2016 10:58:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
11-6412
Agency
Public Works
Council Approval Date
9/20/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YY R4 <br />A101 I 10 LI111 1 1F 0 0 <br />CITY COUNCIL MEETING DATE: <br />SEPTEMBER 20, 2016 <br />TITLE: <br />AWARD CONTRACT TO ARNAZ <br />ENGINEERING CONTRACTORS, INC., FOR <br />THE WALNUT PUMP STATION BUILDING <br />UPGRADE PROJECT (PROJECT 11-6412) <br />(STRATEGIC PLAN NO. 6, 1C) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED ISEP 2 0 2016 <br />I� As Recommended, 23 R <br />❑ As Amended <br />❑ Ordinance on 1'0 Reading <br />❑ Ordinance on 21d Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />y14=li•111iLTif- ;4 <br />1. Award a contract and authorize the City Manager and Clerk of the Council to execute a <br />construction contract to Arnaz Engineering Contractors, Inc., the lowest responsible bidder, <br />in accordance with the base bid in the amount of $3,596,000, for the term beginning upon <br />execution of the contract and ending upon project completion, for the construction of the <br />Walnut Pump Station Building Upgrade project, subject to nonsubstantive changes approved <br />by the City Manager and City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated project delivery cost of $4,854,600, <br />which includes the contract base amount, administration, inspection, testing, and $899,000 <br />contingency. <br />DISCUSSION <br />Since 1956, the City of Santa Ana Walnut Pump Station located at 723 West Walnut Street (north <br />of Santa Ana High School near Flower Street) has pumped well water from the buried First Street <br />Reservoir located beneath the Neal Machander Tennis Center at Heninger Park. The property is <br />owned by the City for water production, storage, and pumping purposes. The existing pumps <br />boost stored groundwater to the City's main distribution pressure zone. A 55 -year-old masonry <br />structure is located just south of the pumps, and houses the pump station electrical equipment, <br />as well as an office and shop facilities, but does not house or shield the pumps themselves, <br />which are outdoors and exposed to the elements. Moreover, the building does not meet current <br />codes and does not provide sufficient space for operation and maintenance activities. <br />The scope of work to replace the aging building includes new piping, pumping, structural, <br />mechanical, and electrical works. The improvement consists of re-routing 24 -inch piping, new <br />discharge heads on pumps, new pump impellers, a new brick building, HVAC systems, <br />ventilation systems, monorail crane hoist system, new transformer, switchgear and motor control <br />centers, well controls, replacement of existing conduits, building electrical and lighting, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.