My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (8)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 12:17:21 PM
Creation date
12/13/2016 11:25:24 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
16-6871
Agency
Public Works
Council Approval Date
10/18/2016
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 18, 2016 <br />TITLE; <br />AWARD CONTRACT TO CALIFORNIA <br />PROFESSIONAL ENGINEERING, INC., FOR <br />CONSTRUCTION OF GRANT -FUNDED SAFE <br />ROUTES TO SCHOOL ENHANCEMENTS AT <br />KING ELEMENTARY (PROJECT NO. 166871) <br />(STRATEGIC PLAN NOS. 6, 1B & 1G) <br />f <br />CITY MAN °R <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED OGT 1%Z016 <br />IJ As Recommended 23 <br />❑ As Amended <br />❑ Ordinance on 151 Reading <br />❑ Ordinance on 2"d Reading <br />❑ Implementing Resolution <br />❑ set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract and authorize the City Manager and Clerk of the Council to execute a <br />construction contract to California Professional Engineering, Inc, the lowest responsible <br />bidder, in accordance with the base bid in the amount of $363,943, for the term beginning <br />upon execution of the contract and ending upon project completion, for the Safe Routes to <br />School Enhancements for King Elementary project, subject to nonsubstantive changes <br />approved by the City Manager and the City Attorney. <br />2. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$454,238, which includes the contract bid amount, administration, inspection and testing, and <br />an authorized contingency of $36,395. <br />DISCUSSION <br />The recommended actions are needed for the City to proceed with the installation of traffic safety <br />enhancements on City streets adjacent to King Elementary School (Exhibit 1). The improvements <br />include a new traffic signal on McFadden Avenue at Pacific Avenue, and bulb outs on Graham <br />Lane at McFadden to slow down vehicles and narrow the roadway for pedestrians crossing the <br />street. Once completed, these improvements will increase the school-age pedestrian safety <br />while promoting more walking at this location. <br />As part of this project, the existing marked school crosswalk at the un -signalized intersection of <br />McFadden Avenue and Graham Lane will be realigned one block to the west so that it coincides <br />with the new signalized intersection being installed as part of this project at McFadden Avenue <br />and Pacific Avenue. However, despite the fact the school crosswalk is being re -aligned, it could <br />be considered a crosswalk removal. Per the California Vehicle Code (CVC), crosswalk removal <br />requires that a public notice be posted at least 30 days prior to removal. Therefore, to ensure <br />that the CVC requirements are met, a public notice was posted on Thursday, October 6, <br />
The URL can be used to link to this page
Your browser does not support the video tag.