My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - AGMT - ZOO RIVER OTTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/20/2016
>
25J - AGMT - ZOO RIVER OTTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 10:39:33 AM
Creation date
12/15/2016 4:54:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25J
Date
12/20/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Observation Reports <br />On -Site Meetings with Owner and <br />Construction Manager <br />TASK 5.7: BIDDING AND PERMITTING <br />The key Design Team members will participate in a pre-bid meeting in order to present the <br />project to bidders and answer questions. We feel that it is critical with the uniqueness of zoo <br />projects such as this, that we participate in giving bidding contractors the "big picture" as <br />well as answer detailed questions.The Design Team will also be available bytelephone/web- <br />based meeting during the bid process to answer questions. <br />Key Tasks: <br />• Participate in pre-bid walk-thru and interview contractors. <br />• Review and respond to contractor RFI's during the bid period. <br />• Issue clarifications to the Bid Documents/Addendum if necessary for both contractors <br />and City Agencies as part of the permitting process. <br />• Review Substitution Requests submitted by the contractors. <br />• <br />Assistwith analysis of construction bids and participate with theZoo/CM tomakefinal <br />recommendations. <br />TASK 5.2: CONSTRUCTION ADMINISTRATION <br />The unique nature of zoo facilities and construction requires the experienced involvement <br />of CLR as well as the day to day availability of our local engineering firms. It is anticipated <br />that CLR will attend approximately one meeting per month on-site at critical stages during <br />construction. The CLRTeam will provide the necessary services outlined below. <br />Key Tasks: <br />• Site Observation Reports <br />• RFI responses <br />• Review and processing of Submittals and Shop Drawings <br />• Issue clarifications to the Construction Documents via ASI <br />• Design Team attendance of weekly Owner/Architect/Contractor coordination <br />meetings, either via conference call or web -based application (i.e. GoToMeeting), or <br />on-site periodically if required. <br />• Review of contractor Change Notifications and Change Orders. <br />• Review of Certificates of Payment/Pay Applications. <br />Issuance of Punch -List and final Punch -List observation on-site. <br />TASK 5.3: PROJECT CLOSEOUT <br />We know the importance of seeing a project through until the very end. This is the time <br />when contractors typically demobilize and start thinking about the next project. We feel <br />it is imperative for the Owner/Architect/Engineer/CM team to stay on task to ensure the <br />project is complete and the full vision is realized. The CLR Team will provide project close- <br />out services as outlined below. <br />Key Tasks: <br />• Final Punch -List observation on-site and processing offinal Pay Application. <br />• Preparation/submission of Record Documents in CAD and PDF format. <br />• Mechanical/LSS Systems Start -Up (as required). <br />• Review of O&M Manuals, Warranty Packages, and Service Provider Agreements. <br />24 CLR I AUGUST 22, 2016 <br />25J-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.