My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEBER WATER RESOURCES, LLC-2016
Clerk
>
Contracts / Agreements
>
W
>
WEBER WATER RESOURCES, LLC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2016 8:32:53 AM
Creation date
12/29/2016 8:31:16 AM
Metadata
Fields
Template:
Contracts
Company Name
WEBER WATER RESOURCES, LLC
Contract #
A-2016-312
Agency
PUBLIC WORKS
Council Approval Date
11/15/2016
Insurance Exp Date
5/1/2017
Destruction Year
0
Document Relationships
WEBER WATER RESOURCES, LLC
(Amended By)
Path:
\Contracts / Agreements\W
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C"Ti'1",,O SANTA ANA <br />RYP NO;: 16-090 <br />WATER'h'ELL,, PUMP AND MOTOR REPAIR SERVICE'S <br />1. Visually Inspect coils and windings for excessive wear, signs of conductor overheating or fatigue <br />that possibly would not be apparent during an electrical test, <br />2. All stators shall be surge- tested with an electronic surHe tester specifically designed to apply a <br />surge voltage stress test simultaneously between turns of a coil, between phases, from winding to <br />ground and to detect, short-circuited turns in winding under test. Testing shall be per EASA,IEEE <br />52.2,-11.2 and 7.2.3 standards. Infrared Imaging shall be provided, pre aped post test, <br />d. Mechanical Fit <br />1. Measure the bearing bores, shells, housings and shaft journals using a micrometer. Shaft fits and <br />housing fits shall comply with ARI DO -2'015. Machine work shall be approved by the, Engineer <br />before being performed or machine work may not be pard for, gearing journals, sea[ surfaces and <br />bearing housing restoration shall be done by metalizing and machining or boring and sleeving. <br />Documentation of before and after measurements shall be made. <br />2. Replace bearings per manufacturer's specifications. All grease fittings, plugs, etc, shall be replaced <br />unless otherwise indicated by the Engineer, Bearings shall be properly lubricated and bearing o.il <br />reservoirs shall drained for shipping and installation. The Contractor shall be responsible for filling <br />the bearing oil reservoir upon installation. All equipment shall be tagged with Information as to <br />whether or not bearing oil reservoirs were filled and what type of lubricant was used, <br />e. Rotor Balancing <br />1. All rotors of motors rated at 50 HP/360011800 RPM and above shall be dynamically balanced, with <br />the rotor running at rated speed where practical, but not less than 600 RPM In the batanoe stand. <br />The balancing speed shall also be rapid enough so the. balance machine sensitivity can reliably <br />measure the maximum allowable residual unbalance. <br />2. A printout tape from the balanoefanalyzer shall be furnished detailing the final balance values. This <br />tape will be attached to the recondition/repair/rewind documents when the motor is delivered. <br />f. Motor t.eads <br />Motor leads shall be permanently tagged: with non-magnatic .markers, Motor lead configuration shall <br />not be altered. <br />g. Insulation <br />1, windings shall. be double -dipped with Class kt varnish and baked. <br />2, Maohine-finished surfaces bore of .thp stator lamination and periphery of the rotor laminations shall <br />be cleaned of all varnish and foreign materials. Photo documentation of this process shall be made <br />prior to and after lamination, <br />h.. Final Test <br />1. A 1000 volt meg-ohm meter shalt be used to verify insulation continuity. This reading shall be <br />documented. After reassembly, motor shall be test -run at rated voltage and frequency. No load <br />voltage and phase currents shall be recorded. Vibration mils displacement shall be measured and <br />recorded in the horizontal, vertical and axial planes on both ends of the motor, or top and bottom of <br />vertical motors and documentation of current reading and vibration readings shall be provided to the <br />Engineer. <br />2. A 5KV meg-ohm meter shall be used to verify insulation continuity of all 4160V motors. <br />I. Paint <br />1. Exterior of motor shalt be properly cleaned of rust and foreign material, prime painted and finish <br />painted with a good grade of machinery enamel, the same color as received unless otherwise <br />specified. Nameplates, machined surfaces and internal parts shall be protected from paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.