My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BAKERSFIELD WELL & PUMP CO.-2016
Clerk
>
Contracts / Agreements
>
B
>
BAKERSFIELD WELL & PUMP CO.-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:39:56 PM
Creation date
12/29/2016 8:46:35 AM
Metadata
Fields
Template:
Contracts
Company Name
BAKERSFIELD WELL & PUMP CO.
Contract #
A-2016-311
Agency
PUBLIC WORKS
Council Approval Date
11/15/2016
Insurance Exp Date
3/1/2020
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY ()F $ANTA ANA <br />RFP NQ.: 16-090 <br />WATER WELL., PUMP AND MOTOR REPAIR SERVICES <br />1, Visually Inspect coils and windings for excessive wear, signs of conductor overheating or fatigue <br />that possibly would not be apparent during an electrical test <br />2. Alf stafors shall be surge- tested with an electronic surge tester specifically designed to apply a <br />surge voltage stress test simultaneously between turns of a coil, between phases, from winding to <br />ground and to detect short-circuited turns in winding under test. Testing shall be per EASAIEEE <br />62 2, 112 and T2.3 standards, infrared Imaging shell be provided. pre and post test, <br />Mechanloaf Fit <br />1 Measure the bearing bores, shells, housings and shaft journals using a micrometer. Shaft fits and <br />housingfits shall comply with AR100-2015. Machine work shall be approved by the Engineer <br />before. being performed or machine work may not be paid for.. Bearing journals, seal surfaces and <br />bearing housing restoration shall be done by metalizing and machining or boring and sieaving, <br />Documentation of before and after measurements shaft be made, <br />2. Replace bearings per manufacturer's specifications. All grease fittings, plugs, etc, shall be replaced <br />unless otherwise indicated by the Engineer. Bearings shall be properly lubricated and bearing oil <br />reservoirs shall drained for shipping and Installation. The Contractor shall be responsible for filling <br />the bearing oil reservoir upon installation. All equipment shall be tagged with information as to <br />whether or not bearing oil reservoirs were filled and what type of lubricant was used, <br />e. Rotor Balancing <br />1, All rotors of motors rated at.50 HP/3600/1600 RPM and above shall be dynamically balanced with <br />the rotor running at rated speed where practical, but not less than 600 RPM In the balance stand. <br />The balancing speed shaft also be rapid enough so the balance machine sensitivity can reliably <br />measure the maximum allowable residual unbalance. <br />2. A printout tape from the balance/analyzer shall be furnished detailing the final balance values.. This <br />tape will be attached to the. recondition/repairtmwind documents when the motor is delivered. <br />f. Mot& Leads <br />Motor leads shall be permanently tagged with non-magnatic markera, Mot lead configuration shall <br />not be alleged. <br />g; insulatian <br />1. Windings shallbe double -dipped with. Class varnish: and baked, <br />2. Machfna-finished surfaces bore of the stator lamination and periphery of the rotor laminations shall <br />be cleaned of all varnish and foreign materials. Photo documentation of this process shall be made <br />prior to and after lamination, <br />h. Final Test <br />1. A 1000 volt meg-ohm meter shall be used to verify insulation continuity. This reading shalt be <br />documented, After reassembly; motor shall be test -run at rated voltage and frequency. No load <br />voltage and phase currents shall be recorded. Vibration mils displacement shall be measured and <br />recorded in the horizontal, vertical and axial planes on both ends of the motor, or top and bottom of <br />vertical motors and documentation of current reading and vibration readings shall be provided to the. <br />Engineer. <br />2, A 5KV meg-ohm meter shall be used to verify Insulation continuity of all 4160V motors. <br />I. Paint <br />1, Exterior of motor shall be properly cleaned of rust and foreign material, prime painted and finish <br />painted with a good grade of machinery enamel, the same color as received unless otherwise <br />specified. Nameplates, machined surfaces and internal parts shall be protected from paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.