Laserfiche WebLink
�����U�� ��� ���8���0����� <br />������0—� ��� ������N�w��� (ONT|NUED <br />TASK 3:DESIGN DEVELOPMENT <br />Upon approval of Schematic Design the project team will proceed with Design Development, <br />This will involve 2-3 on -site workshops in which we will meet with key Zoo user groups such <br />as executive staff, animal staff, visitor services, ground »/naintevanoe, and horticulture, as <br />well as increased design coordination meetings with the engineering disciplines, <br />Key Tasks: <br />~ Confirm/refine the project requirements based on the lm0%complete SDCoa <br />Estimate. <br />^ Focused workshops with key Zoo user groups. <br />` Develop the site plan in the vicinity of the building, building |ayou1, exhibits and <br />detailed building systems and infrastructure drawings. <br />~ Development of animal activity/e n rich me nt and other activity -based concepts. <br />` Focused development of interior and exterior caging/barrier plans and details based <br />onthe approved Basis ofDesign from the previous work phase. <br />~ Focused and detofledcoordination meetings with engineers. <br />- Coordination of Interpretive Design (by others) messaging goals, concepts and detaills. <br />~ Continued collaboration with the Owner and Construction Manager (delivery method <br />tobeconfirmed) tntrack project costs and schedule. <br />TASK 4aCONSTRUCTION DOCUMENTATION <br />This phase will involve approximately 3 workshops in which we will meet less with key <br />Zoo user groups and spend more time omondinabmg with the Zoo's Project Manager and <br />engineering disciplines in order to develop the permit, bid and construction documents, <br />Key7asks� <br />~ [onhrm/rufi:me the project requirements based on the 10096 complete DD Cost <br />Estimate. \` <br />~ Focused workshops with key user groupsin order to complete the documents and <br />assure the inclusion of all ,he connpon4ntsthvt make up the project program and <br />vision. <br />^ Finalize detailed building and si*e/exhibitengineehng systems and infrastructure <br />drawings, <br />' Focused and detailed coordination meetings with engineers and the Zoo's Project <br />Manager. <br />` Pvepemm|om, completion, and submission of all plans and narratives required for <br />agency approvals including bmfldingand site permits. <br />' Continued collaboration with the Construction Manager(if applicable) totrack project <br />costs and schedule. <br />�AuTAAwx0� | G/»mrmvEnOTrEnPnO�E[T ^��� <br />