My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRL DESIGN-2016
Clerk
>
Contracts / Agreements
>
C
>
CRL DESIGN-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 12:56:07 PM
Creation date
3/6/2017 9:50:10 AM
Metadata
Fields
Template:
Contracts
Company Name
CRL DESIGN
Contract #
A-2016-377
Agency
Public Works
Council Approval Date
12/20/2016
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Observation Reports <br />On -Site Meetings with Owner and <br />Construction Manager <br />TASK 5.11: BIDDING AND PERMITTING <br />The key Design Team members will participate in a pre -bid meeting in order to present the <br />project to bidders and answer questions. We feel that it is critical with the uniqueness of zoo <br />projects such as this, that we participate in giving bidding contractors the "big picture" as <br />well as answer detailed questions.The Design Team will also be available by telephone/web- <br />based meeting during the bid process to answer questions, <br />Key Tasks: <br />• Participate in pre -bid walk-thru and interview contractors. <br />• Review and respond to contractor RF1'5 during the bid period. <br />• Issue clarifications to the Bid Documents/Addendum if necessary for both contractors <br />and City Agencies as part of the permitting process, <br />• Review Substitution Requests submitted by the contractors. <br />• Assist with analysis of construction bids and participate with the Zoo/CM to make final <br />recommendations. <br />TASK 5.2: CONSTRUCTION ADMINISTRATION <br />The unique nature of zoo facilities and construction requires the experienced involvement <br />of CLR as well as the day to day availability of our local engineering firms. It is anticipated <br />that CLR will attend approximately one meeting per month on -site at critical stages during <br />construction, The CLRTearn will provide the necessary services outlined below, <br />Key Tasks: <br />• Site Observation Reports <br />• RFl responses <br />• Review and processing of Submittals and Shop Drawings <br />• Issue clarifications to the Construction Documents via ASI <br />• Design Team attendance of weekly Owner/Architect/Contractor coordination <br />meetings, either via conference cak or web -based application (i.e. GoToMeeting), or <br />on -site periodically if required, <br />• Review of contractor Change Notifications and Change Orders. <br />• Review of Certificates of Payment/Pay Applications. <br />• Issuance of Punch -List and final Punch -List observation on -site, <br />TASK 5.3. PROJECT CLOSEOUT <br />We know the importance of seeing a project through until the very end. This is the time <br />when contractors typically demobilize and start thinking about the next project. We feel <br />it is imperative for the Owner/Architect/Engineer/CM team to Stay on task to ensure the <br />project is complete and the full vision is realized. The CLR Team will provide project close- <br />out services as outlined below. <br />Key Tasks: <br />• Final Punch -List observation on -site and processing of final Pay Application, <br />• Preparation/submission of Record Documents in CAD and PDF format. <br />• Mechanical/LSS Systems Start -Up (as required), <br />• Review of O&M Manuals, Warranty Packages, and Service Provider Agreements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.