My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - STREETCAR DESIGN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25E - AGMT - STREETCAR DESIGN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:06:18 PM
Creation date
3/30/2017 5:32:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT B <br />5.11.3 Activity Periods <br />The AUTHORITY may conduct operations and maintenance activities at the MSF at any time <br />and on any day. <br />6.0 DESIGN <br />6.1.1 Design Criteria <br />The AUTHORITY will develop design criteria and standards for the Project that are consistent <br />with CITY design standards and guidelines. Applicable City standards are those in place on the <br />Effective Date of this Agreement unless agreed to otherwise. The Project design criteria shall include <br />the technical requirements and provisions for the Project and include which standards, specifications, <br />and other requirements will be adhered to by the AUTHORITY's design consultants and Construction <br />Contractors. The CITY shall review and approve design criteria that affect CITY owned assets. The <br />Project design criteria shall include a design exception process with the approval of the applicable <br />Party included. Once adopted, design criteria and referenced criteria requirements will not change <br />unless agreed mutually otherwise. <br />6.1.2 Project Information <br />The CITY shall provide the AUTHORITY with electronic copies of all available record drawings, <br />CADD files, and any other documents applicable to the Project. <br />6.1.3 Construction Phasing <br />During design, the AUTHORITY and the CITY will work collaboratively to develop the <br />construction phasing for the Project. The AUTHORITY and the CITY shall gather input from the public <br />in the development of construction phasing alternatives. The construction phasing plan shall be <br />developed by the sixty (60) percent design level of completion in order for the information to be <br />implemented into the Plans and Specifications. <br />Exhibit B <br />Page 13 <br />L: \Camm\ CLERICAL \WORDPROC\AGREE\AG53583 2gt 2l6 f4.27,docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.