My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - STREETCAR DESIGN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25E - AGMT - STREETCAR DESIGN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:06:18 PM
Creation date
3/30/2017 5:32:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT B <br />The CITY shall not unnecessarily withhold the signing of the Ready to Bid cover sheet if the <br />AUTHORITY has addressed all comments in good faith. If no comments have been elevated in the <br />Dispute Resolution process as provided for in Article 101, the AUTHORITY may proceed into <br />construction fourteen (14) days following written notice to the CITY that all comments have been <br />addressed without the City's signature on the cover sheet. <br />6.1.7 Artistic Influence <br />The extent of the AUTHORITY's Project artwork obligations shall be to contract a station and <br />urban design consultant to develop aesthetic design concepts that will incorporate artistic influence <br />into the Project. Any artistic influence incorporated into the Project must meet FTA guidelines as an <br />eligible expense. All other requested artwork shall be considered a Betterment. <br />6.1.8 Station and Urban Design <br />The AUTHORITY shall develop station and urban design concepts through an urban design <br />consultant separate from the Project Design Consultant's scope of work, and gather community input <br />on the urban aspects of the Project. The AUTHORITY is committed to an iterative process focused <br />on securing community stakeholder consensus prior to advancing the concepts to final design. The <br />Parties agree that the iterative process shall be orchestrated in a manner that reduces the number of <br />concepts with each iteration. Once consensus is reached, the AUTHORITY shall advance the concept <br />to the Design Consultant responsible for final design. <br />7.0 PUBLIC INVOLVEMENT <br />The AUTHORITY shall lead Project public involvement. The AUTHORITY shall develop and <br />implement a public awareness campaign (PAC) in collaboration with and including input from the CITY <br />that includes business outreach to advise businesses, residents, elected officials, motorists, and <br />media of Project status. The AUTHORITY shall report on activities and collateral material <br />development during the Project. The AUTHORITY shall keep the CITY informed on PAC events, <br />notices, and Project updates. <br />Exhibit B <br />Page 16 <br />L: \Cam m \CLE RI CAL \W ORDP ROC\AG R EE\AG5351�tlEGt-dS l §.04.27. d ocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.