My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - STREETCAR CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25F - AGMT - STREETCAR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:06:47 PM
Creation date
3/30/2017 5:33:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -6 -1516 <br />EXHIBIT B <br />4.8.2 Requests for Information <br />Requests for Information (RFI) are submitted by the Construction Contractor requesting <br />information, clarification, or providing a recommendation for a design modification. The AUTHORITY <br />shall address in writing all RFIs to the extent possible. All RFIs related to CITY facilities shall be routed <br />to the CITY by the AUTHORITY for response approval. <br />4.8.3 Design Changes During Construction <br />Modifications to the Plans and Specifications shall be reviewed in the weekly construction <br />meeting and those modifications related to facilities within the CITY Right of Way shall be approved <br />by the CITY prior to issuance to the Construction Contractor. <br />4.9 CONSTRUCTION ACCEPTANCE <br />The AUTHORITY and the CITY shall jointly develop a procedure that allows the AUTHORITY <br />and the CITY to review the progress of the Project, develop lists of items requiring correction, and <br />otherwise determine that the Project is being completed in a satisfactory manner and consistent with <br />the Plans and Specifications. <br />The AUTHORITY shall provide the CITY with as -built drawings of CITY facilities in PDF format. <br />The AUTHORITY shall provide and maintain up -to -date as -built drawings as changes are <br />implemented and complete project as- builts within three (3) months afterthe start of Revenue Service. <br />4.10 PERMITS <br />The CITY shall issue a Project permit and any riders thereto for the construction of the Project <br />consistent with the Plans and Specifications. The CITY shall be responsible for reviewing and issuing <br />encroachment and other applicable permits to third party utilities for the construction of the Project. <br />The CITY shall issue permits within thirty (30) days contingent no corrections are needed. The <br />AUTHORITY agrees to comply with the requirements for permits issued by the CITY; provided such <br />requirements are typical for similarly situated persons or entities. <br />Exhibit B <br />Page 6 <br />25F -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.