My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - STREETCAR CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25F - AGMT - STREETCAR CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:06:47 PM
Creation date
3/30/2017 5:33:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -6 -1516 <br />EXHIBIT B <br />4.11 SAFETY <br />The AUTHORITY shall develop construction safety procedures for AUTHORITY and CITY <br />employees conducting inspection or oversight activities on the Project. The CITY agrees to adhere to <br />the construction safety procedures developed for the Project. <br />4.12 TESTING AND STARTUP <br />The AUTHORITY is responsible for the startup and testing of the constructed facilities. <br />AUTHORITY shall coordinate with the CITY with respect to traffic control, signal adjustments, and <br />other activities associated with activating the OC Streetcar System. <br />5.0 COORDINATION WITH CITY PROJECTS <br />5.1 CITY BIKE LANE PROJECT <br />The CITY intends to construct the City Bike Lane Project within the construction limits of the <br />Project during Project construction. The following provisions shall be followed: <br />A. The CITY shall utilize the Project horizontal and vertical control for the City Bike Lane Project. <br />B. The CITY shall utilize the Project track and roadway horizontal alignment in the design of the <br />City Bike Lane project; <br />C. The CITY shall provide the AUTHORITY with the City Bike Lane Project design plans at the <br />30 %, 60 %, 90 %, and 100% stage of development and provide the AUTHORITY with an <br />opportunity to review and provide comments. The CITY shall provide the AUTHORITY a three <br />(3) week advance notice prior to the release of each design review package. The total review <br />time shall be thirty (30) days for each formal review package submittal. The thirty (30) day <br />period begins when the AUTHORITY receives the submittals. The AUTHORITY shall provide <br />written comments on hard -copy prints, in PDF format, or tabular comments with clear reference <br />to where the comment applies in the review set. Comments must be clear, concise, and <br />legible. Prior to submission to the CITY, the AUTHORITY shall resolve conflicting comments; <br />D. The AUTHORITY shall reserve all comments to only those that may impact the Project or <br />Revenue Service. All comments provided by the AUTHORITY which the CITY does not <br />Exhibit B <br />Page 7 <br />25F -27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.