Laserfiche WebLink
Energy Management Solutions Incentives <br />Application for Business Customers <br />2013 - 2014 Customized Installation Report <br />DIRECTIONS: After your project is installed and operational, input the project installation commencement and completion dates in the fields <br />provided. Review the information from your Application Approval Letter. If nothing has changed, and the information in Sections 5 and 6 is <br />correct, complete and sign Section 7 on page 2 of this Installation Report (IR) Form and submit both pages to SCE at one of the addresses below. <br />ly, - *V: <br />UPN #: 353 -15- 0500834485 SA #: 3- 001- 3274 -63 Project Name: PRP- SANTA ANA MC FADDEN LEARNINI <br />Customer Name CITY OF SANTA ANA Customer's Authorized Agent: THE ENERGY COALITION <br />Installation Commencement Date. Installation Completion Date: <br />Line # Solution Code Solution Description Description of Existing Equipment <br />1 LT -17492 Interior LED fixture replacement (utilizing approved <br />Iuminarloal. <br />2 LT -85834 Exterior LED fixture replacements (utilizing approved <br />h,m inadecl. <br />3 <br />4 <br />5 <br />Note: If submitting more than 5 Solutions complete and attach the Customized Solution page from the Multiple Site/Solution Worksheet at www.sce.comisolutions. <br />:alculated <br />Solution # <br />3 — <br />_._� — <br />5S <br />Energy <br />J%j Zl b 10,40L.V IO,YaJ O <br />16,826.4 5,084.0 11,742.4 <br />I vial rrulea was lei <br />Incentive Energy 104.363 93 <br />Rate ($[kWh) Incentive ($) <br />$ 0.08 $ 1,475.18 Calculated Energy Savings Totals <br />$ 0.08 $ 93939 30,182.2 <br />vn -reap vemanu «eaucnun <br />Calculated <br />Solution <br /># from above <br />Baseline <br />On -Peak <br />Demand (KW) <br />Installed <br />On-Peak <br />Demand (KW) <br />On -Peak <br />Demand <br />Reduction (KW) <br />Peak Demand <br />Reduction <br />Incentive ($) <br />1 <br />9.57 <br />4.52 <br />5.05 <br />$ 757.50 <br />2 <br />$ _ <br />3 <br />— Calculated Savings Incentives <br />m,11%RnIltC111A,111111,11 Ill AppllceOlo) <br />7,276.66 <br />(kW) <br />5.05 <br />SAO 3- 001 - 3274 -63 <br />UPN # 353 -15- 0500634485 <br />NOTE: For projects requiring M &V, attach any required <br />baseline or post - installation measurements and analysis, as <br />specified in your approved M &V plan <br />Line # Solution Code Solution Description Description of Existing Equipment <br />1 <br />2 - <br />3 _ <br />4 <br />Note: If submitting more than 5 Solutions complete and attach the Customized Solution page ofthe Multiple Site/Solution Worksheet atwwwece.comisolulions. <br />251 -8 <br />Page 1 <br />