My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - LIGHTING FIXTURES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25I - AGMT - LIGHTING FIXTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:21:39 PM
Creation date
3/30/2017 5:35:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25I
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section <br />6) Energy Savings (if Different from Original Application) <br />Energy Savings .. <br />Total Project Cost I$) <br />Calculated <br />Baseline <br />Installed <br />Energy <br />Incentive <br />Energy <br />Solution # <br />Usage (kWh) <br />Usage (kWh) <br />Savings (kWh) <br />Rate ($ /kWh) <br />Incentive ($) <br />2 <br />Calculated Energy Savings Totals <br />_ _ <br />3 <br />4 <br />Calculated Savings Incentives <br />5 <br />Section 6) On-Peak Demand Reduction (if Different from Original Application) <br />_ On -Peak Demand Reduction On-Peak Demand Reduction (kW) <br />— <br />Calculated Baseline Installed On-Peak Peak Demand <br />Solution On -Peak On -Peak Demand Reduction <br /># from above Demand (KW) Demand (KW) Reduction (KW) Incentive ($) <br />1 sA# 3 -001- 3274 -63 <br />2 UPN # 353 -15- 0500834485 <br />-- 3 -- <br />__ 4 NOTE: For projects requiring M &V, attach any required <br />5— baseline or post - installation measurements and analysis, as <br />- -- - - - - -- •-- — specified In your approved M &V plan. <br />Section • • Operation <br />Check appropriate boxes: <br />No changes to the proposed solutions have been made since the Project Application Review and Approval and the Authorized agent verifies <br />that the Application approved savings calculations are correct. <br />Due to changes to the proposed measures, appropriate adjustments in the savings calculations have been made. <br />For measures with changes made during installation, use this section, and Sections 5 & 6 on page 2, to calculate the revised installed energy usage, <br />(� energy savings, peak demand reduction, and incentives. Attach the appropriate calculation backup: the output from the Estimation Software, <br />Calculate Energy Savings Total or the calculation sheets that document the engineering calculations. <br />To <br />be completed only if you have installed retrocommissioning (RCx) measures: <br />Attach the following supporting documentation with this Installation Report, or email it to the SCE RCx program manager: <br />Verification data as evidence of implementation. <br />Updated savings calculations, where applicable. <br />Copies of invoices for implementation, as proof of the Customer's implementation costs. <br />RCx Training Completion Form including the training agenda, training materials, list of attendees, and measure persistence <br />strategies: <br />See the RCx Program Guidelines for more information on these items. <br />To be completed only if you are requesting an HVAC Rebate: <br />1. HVAC Permit (if required) If a permit is required for any HVAC installation /replacement, I have provided the permit number below, (If no permit <br />is required, leave this section blank.) Permd # :Agency <br />2. Contractor Certification. If a contractor was used for any HVAC installation /replacement, this section must be completed by the contractor. ' <br />By checking this box I certify, I am a licensed contractor and have followed applicable permitting requirements and, if required, that the HVAC <br />permit information above is correct <br />Signature of on rac or ame p easeprin Date <br />Signature I, the Customer or Authorized Agent below, certify that (1) the Energy Efficiency Solutions have been completely installed, functionally tested and proven capable of <br />operating and being maintained to perform in conformity with their design intent, and (ii) that a licensed contractor was used, where applicable, and all applicable permitting <br />requirements for this installation were followed. The installation date of operation of the Energy Efficiency Solutions and any required monitoring data collection per <br />approved M &V plan, are also certified. <br />Signature Name (please print) de ate <br />251 -9 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.