My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/18/2017
>
25I - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 11:10:46 AM
Creation date
4/13/2017 5:46:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
4/18/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO,: 16.114 <br />SUEFURFACE UTILITY EiN'GINEERINGSERVICES <br />• All completed reports shall be certified to be correct and signed by a professional land surveyor <br />registered in California, (Only if required by the Engineer), Work under this category will be <br />paid on hourly basis. <br />• Backfrll all test holes shall be backfilled with in -kirrd .material and compact to a relative <br />compaction of 90 %, <br />• Borellolos greater than 2RI shalt be paved and match existing pavement thickness section unless <br />stated otherwise and or approved by the Engineer. <br />Clean and sweep work site at the end of the work day, <br />« Provide additional surveying, and undergrornd utility snapping services at an hourly rate <br />General R.eguirernettts and Pi,oiect Deliverables° <br />• All work for this work. for traffic control shall be done in accordance with the Federal Highway <br />Administration's Manual (MUTCD) <br />• The selected firrn/s shall obtain all necessary permits from the City and local jurisdiction prior to <br />commencing any of the work 11 P'ub'lic Right of Way, <br />• Any work required on private property shall be authorized by the Enjpleer prior to corrnnencement <br />o:f wad., <br />• All wort. shall 'be, done in accordance with ASCE Standard 38.02; Standard Guideline for the <br />collection and depiction of the existing subsurface utility data. <br />• The firnr/s shall securc all permits to worlc in the City. These fees are not reimbursable. <br />• All work shall be performed to the specific project and or location as detailed ill the notice to <br />proceed and indicated by the Engineer. <br />• All reports and technical memoranda shall be submitted electronically to City and shall include all <br />the information as required and detailed in the notice to proceed, All Computer Aided Drafting <br />Design (CADD) work shall be, submitted on electronic format Whorostation). In addition, a hard <br />copy of the project findings and a digital file in Microstation shall be submitted to fhe engineer for <br />reviewbo[are final approval and final payinent is authorizers. <br />A list of positions and hourly rates shall be included as part of the proposal and included in the seal bid <br />package, See Attachment 4— ADDITIONAL PROVISIONS for a sample breakdown. <br />The consulting orris are responsible for any damage to utilities during the locating efforts. <br />Consultant Responsibilities: <br />Consultant Audit find Review Process: Prior to awarding the contract, the selected Consultant shall be subject to <br />an audit or review by Caltrans' Audits and Investigations (AM), other state audit organizations, or the federal <br />government. The selected Consultant shall cornptete Exhibit I0 -1{ — Consultant C:ertitioation Contract Costs <br />and Financial, in the Appendix of this RFP as Attacli vent 4. <br />• Time is of the essenco and work shall commence within 5 days of the Notice to Proceed for planned <br />underground utility locating services, <br />251 -41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.