My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/18/2017
>
25I - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 11:10:46 AM
Creation date
4/13/2017 5:46:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
4/18/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO,: 16 -114 <br />SUBFURFACE UTILITY ENGINEERING SERVICES <br />The consultant shall be available to provide on -call services within 48 -hours for unplanned utility <br />locating services, <br />City Responsibilities: <br />The City will provide information in its possesslon relevant to the preparation of the required <br />information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein, <br />Fee Proposal: <br />lu addition to Section IY,13,3 (Submittal Requirements: Fee Proposal) fee schedule shall be stiuctur•ed as follows: <br />• for Caltrans handed projects, ref recce LAPVl Exhibit 10 -H (samaple cost proposal) and hicl,ude ht <br />Attachment 4. <br />• The City will select up to (three) fines to provide the setvicas <br />• The fee proposal shall uiclude the firm's standard hourly fee schedule, and /or project fee <br />schedule where applicable and as outlined in this this documents. <br />Special Reguirement,s (Attachment 4): <br />_Compliance with Regu rements �U Avoncv use as appropriate /delete reused seotious: <br />If Ctu trans: <br />This project is funded through XXXX and shall comply with all requirements ofXXX'X <br />The attached forms must be completed in their entirety and submitted with your proposal: <br />LAPM E.xlaibit IO -H: Sample Cost Proposal <br />« LAPM Exhibit 10-1: Notice to Proposers, DBE Information <br />LAPM Exhibit 1.0.01:. Consultant Proposal DBE Commitment <br />• LAPM Exhibit 10 -Ii: Consultant CertiCeation of Contract Costs and Financial management System <br />Ir the project will be financed by federal farads all services rendered shall meet all required federal requirements <br />included in this request Pot proposal, Consultants are advised that, as required by federal law, the City of Santa <br />Ants is implementing the new Race Conscious Disadvantaged Business Enterprise (DBE) Program, The DBE <br />goal for this contract is 9.60 %. <br />251 -42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.