Laserfiche WebLink
Solution: We will begin evaluating sight lines at the <br />initiation of Project work by recording existing sight line <br />deficiencies in the field observation. Our Designer's will <br />seek to eliminate or improve existing deficiencies and <br />review resulting lines of sight on the design base. Areas <br />of concern are annotated with sight lines drawn on an <br />exhibit for evaluation and documentation purposes. See <br />Figure 4 indicating design consideration. <br />DtivewKays <br />Issue Driveways present one of the most common Figure 4 - Consideration of sight lines is a critical <br />conflicts with cyclist since they are typically uncontrolled element fora safe bikeway. <br />and occur frequently along the alignment. In addition, <br />driveways tend to be a common area where restricted sight lines cannot be feasibly mitigated. <br />Solution: Our Team will review driveway conditions and note those with sight line deficiencies or other <br />elements that may lead to potential conflicts. We will also identify commercial driveways with significant <br />traffic volumes. At these locations, we will consider adding signage and markings to warn vehicles of <br />oncoming cyclists. For unique conditions, we will consider warning devices or other treatments to notify <br />cyclists and potentially slow travel to promote safety. See Figures 5 and 6 for typical examples. <br />Figure 5 - Painted bike lane at driveways. <br />Figure 6 - Flexible delineator and painted bike <br />lane at driveway. <br />We have reviewed the detailed scope of work contained in Attachment 1 of the City's Request for Proposals. <br />The following is intended to supplement and clarify scope items to demonstrate phases of work to be <br />completed, tasks to be accomplished, and deliverables to be provided. Additional items that may be required <br />to complete the scope of work are described at the end of the matrix under the heading "Optional Items ". <br />Design plans and reports indicated herein will follow City standard format unless indicated otherwise. A <br />Drawing List indicating anticipated sheet count is included with our fee in the separate, sealed envelope. We <br />assume a nine -month schedule for design beginning in April 2017 with work completed by January 15, 2018. <br />Our proposed schedule is provided at the end of this section. <br />Task 1: Project Coordination and Meetings <br />Kimsey -Horn will meet and/or communicate with City staff and other stakeholders to coordinate design <br />elements. This encompasses coordination with the OC Streetcar design team and other stakeholders, such <br />Kirnley» )Horn 20A-14 TRE077007.17I City of Santa Ana <br />