Laserfiche WebLink
as Garfield Elementary School. We will conduct meetings and conference calls, and provide pertinent <br />meeting minutes with action items. The also encompasses phone and email communications. The following <br />meetings are included in our scope): <br />• One Kickoff Meeting <br />• Four Monthly PDT Meetings <br />• Three Focus Meetings <br />Deliverables: Meeting agendas, meeting minutes, action items. <br />Task 2: Survey <br />The Kimley -Horn team will provide aerial mapping with supplemental ground surveys at a scale of 1" <br />20' at the locations of proposed median islands and bulb -outs within the project limits indicated in <br />the RFP. Ground surveys will be used for the areas where more accuracy is needed for design of the <br />proposed median islands and curb returns as shown in the RFP exhibits. This encompasses survey record <br />collection; establishment of horizontal and vertical controls; monument and centerline tie preservation; and <br />establishment of temporary benchmarks. Existing features such as utility covers, pavement limits, private <br />property improvements, curb ramps, driveways, curb & gutter, sidewalk, street lights and poles, traffic signs <br />and striping, will be surveyed where needed for the proposed design and added to the base maps. Existing <br />right -of -way will be input according to readily available records. We assume that complete base mapping <br />and surveying are available within the street car corridor areas, and additional surveys in this area are not <br />needed. <br />Deliverables: Microstation V81 Fifes of Topographic Survey, XML Point File, DTM of existing surface <br />features. <br />Task 3: Geotechnical Investigation <br />Infiltration Test and Soil Suitability: The Kimley -Horn team will conduct a geotechnical field investigation <br />as follows: <br />• Percolation rate test at seven locations within the proposed median islands areas. <br />• One boring at the intersection of 6th Street and Mortimer Street to the depth of 15 feet. <br />• Agronomy /soil fertility laboratory testing encompassing: major <br />element fertility package, agricultural suitability package and <br />USDA particle size analysis <br />Data compilation and geotechnical analysis of the field and <br />laboratory tests, consisting of analyses to evaluate and provide <br />recommendations pertaining to the following: <br />Percolation rate characteristics of the soils. <br />• Atterberg Limits / Plasticity Index. <br />• Moisture and Density. <br />• Suitability of the on -site soils for landscape improvements. <br />• Foundation design criteria for new traffic signal poles or signs. <br />Preparation of a report presenting the results of field exploration, geotechnical laboratory testing, <br />engineering analyses, as well as conclusions and recommendations relative to the project. <br />New pavement structural section will be based on City's available data from OC Streetcar project and other <br />similar projects in the area. <br />Deliverable : Draft Soil Material repori, Final Soil Material Report_ <br />City of Santa Ana I TRE077007.17 <br />20AA 5 <br />Kim Iey >))Horn <br />