My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7.2 OCFCD and COSTA MESA shall ensure their O&M Contractor and those performing <br />O&M abide by the Insurance Requirements as specified in Exhibit G (Insurance, Bonds, and <br />Warranties), and name each Party and JWA as an additional insured, and that such Contractor's <br />and subcontractors' indemnity, defense, hold harmless, and insurance obligations under their <br />respective O&M contract with the Contractor and that it expressly benefit each other Party and <br />JWA in the same manner and to the same extent as if they were the original signatories of said <br />contract. OCFCD and COSTA MESA shall further ensure workers including third party <br />contractors follow the O&M Manual and other maintenance manuals or guides for the Facilities. <br />3.7.3 Within fifteen (15) days of written notice from a Project Representative of a necessary <br />.repair and/or replacement_ or. other remedial action for compliance.with the O&M Manual or this <br />Agreement, the O&M Contractor, OCFCD and/or COSTA MESA depending upon the location <br />in need of said work shall promptly take action to perform the necessary work. Should that <br />party not commence or diligently work toward completion of the repairs, replacement, and/or <br />remedy required, the Project Representative may perform or cause the repairs, replacement, <br />and/or remedy to be completed, and the costs thereof may be reimbursed from an O&M Fund. <br />3.7.4 If in the course of nonnal O&M Facility operations, OCFCD/COUNTY notice unusual <br />types and quantities of debris and trash collected at the Facility, the Director will so notify the <br />Parties who may discuss what upstream debris and trash reduction measures should be <br />implemented in the tributary system to resolve this issue which would be addressed in a separate <br />agreement, not included within obligations herein, Costs to implement these measures, as <br />possible, will not be assessed against an O&M Fund unless agreed to by the Parties. Each Party <br />shall maintain its infrastructure, as needed, to minimize the conveyance of any debris and trash <br />to the Diversion Facility. If unusual amounts of debris are found in the Facility, the Parties will <br />discuss what upstream debris and trash reduction measures should be implemented in the <br />tributary system to resolve this issue. <br />3.7.5 Operational and Maintenance Costs <br />Within 40 days of the Effective Date, SANTA ANA shall disburse an upfront, lump -sum initial <br />$1,000,000 payment into the O&M Fund of OCFCD as the Initial O&M Deposit. <br />A Party's proportionate share obligation to fund Additional Annual O&M Costs are to be paid as <br />indicated on Exhibit C2 on, or before January 1St of each year, or as otherwise established in <br />writing by the Parties. OCWD and IRWD shall not have any obligation to fund Additional O&M <br />Costs. Amounts paid by the Parties for Additional Annual O&M may be deposited into separate <br />O&M Fund accounts held by either OCFCD or COSTA MESA designated for O&M of the <br />Facilities. OCFCD and COSTA MESA shall pay costs out of their respective O&M Funds as <br />they become due and in accordance with the terms of this Agreement. COSTA MESA O&M <br />Fund and charges are addressed in Section 5. <br />3.7.6 Overhead <br />3.7.6.1 All O&M costs for Project Facilities allocated to the Parties in accordance with the terms <br />herein shall include the cost of OCFCD/COUNTY labor, services and equipment, determined on <br />a time and material basis, using the actual number of man-hours and equipment -hours required <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 Page 20 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.