My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that such contractor's and subcontractors' indemnity, defense, hold harmless, and insurance <br />obligations under their respective contract expressly benefit each other Party and JWA in the <br />same manner and to the same extent as if they were the original signatories of said contract. <br />COSTA MESA shall further ensure workers including third party contractors follow the O&M <br />Manual and other maintenance manuals or guides for the Facilities. <br />5.7.2 Within twenty (20) days of written notice from a Project Representative of a necessary <br />repair and/or replacement or other remedial action for compliance with the O&M Manual or this <br />Agreement within those portions of the Facilities owned and maintained by COSTA MESA, <br />COSTA MESA shall promptly take the remedial action to perform or have its contract perform <br />the necessary work. Should it not commence or diligently work toward completion of the <br />repairs, replacement, and/or remedy required, OCFCD may perform or cause the repairs, <br />replacement, and/or remedy to be completed, and the costs thereof may be reimbursed by <br />invoicing the other Parties according to their proportionate share as shown in Exhibit C2 and the <br />terms herein. <br />5.8 Additional Annual O&M Costs <br />5.8.1 A Party's proportionate share obligation to fund Additional Annual O&M Costs are to be <br />paid as indicated on Exhibit C2 on, or before January 15t of each year, or as otherwise <br />established in writing by the Parties. OCWD and IRWD shall not have any obligation to fund <br />Additional O&M Costs, COSTA MESA shall pay costs out of its O&M Funds by collaborating <br />with OCFCD to acquire said funds for Facility O&M Costs in accordance with the terms of this <br />Agreement. <br />5.9 O&M or Reserve Fund Utilization <br />5.9.1 In addition to reimbursement for payment of expenses, COSTA MESA may recover as <br />O&M costs allocated to the Parties in accordance with the terms herein its labor, services and <br />equipment costs determined on a time and material basis, using the actual number of man-hours <br />and equipment -hours required (including travel time to and from their respective facilities), <br />multiplied by the applicable rates for the crew members and equipment deployed. After-hours <br />services (defined as between 5:00 p.m. on a working day and 7:00 a.m. on the next, following <br />work -day; a "work day" shall exclude Saturday, Sundays and designated holidays for COSTA <br />MESA unless otherwise approved by the respective Project Representative for COSTA MESA) <br />will be charged at time and a half. Equipment and material rates shall be approved by the <br />Project Representative for COSTA MESA, as the case may be, and in accordance with its <br />respective standards and practices. <br />5.9.2 The labor rates are comprised of direct and indirect components. The direct labor rate <br />component is adjusted periodically by the authorized representatives of COSTA MESA as salary <br />adjustments, which may include cost of living, competitive wage, benefit and annual hourly -rate <br />schedule increases. The indirect component of the labor rate reflects the general and. <br />administrative cost, which shall include COSTA MESA Burden Rate. As of the Effective Date, <br />the Burden Rate for COSTA MESA is 89%. The Parties acknowledge said Burden Rate is <br />subject to change, and agree to pay the Burden Rates in effect when labor, services or equipment <br />are provided. <br />Santa Ana -Delhi Channel Diversion Project Agreement D 15-013 Page 26 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.